ML19340A962

From kanterella
Jump to navigation Jump to search
Requests Proposed Interim Tech Specs Per Encl Revised Sample Fire Protection Tech Specs.Revisions Deal W/Surveillance Frequency & Corrective Action to Be Taken,When Limiting Condition for Operation Not Met.All Elements to Be Included
ML19340A962
Person / Time
Site: Dresden, Quad Cities, Zion  Constellation icon.png
Issue date: 06/24/1977
From: Desiree Davis
Office of Nuclear Reactor Regulation
To: Bolger R
COMMONWEALTH EDISON CO.
Shared Package
ML19340A963 List:
References
NUDOCS 8009100890
Download: ML19340A962 (2)


Text

V

\\

L I-i:ocic t idos. 50-10, 50-237, 50-249, 50-254, 50-265,50-29s and 50-304

[

JUN 241977 Congnonwealth Eoison Co:npany ATTih Mr. R. L. Bolger Assistant Vice President Post Office Sox 767 Chicago, Illinois 60590 Gentlemen:

i RE:

DRESDEN NUCLEAR POWEii STATICt UNIT NOS. 1/2/3, QUAD CITIES HUCLEAR POWER STATI0l! UNIT N05.1/2, ZION NUCLEAR P0iiER STATION UNIT NCS.1/2 By letter cated Decemoer 2,1976, we sent sample fire protection Tecnnical Specifications to you for your guidance in proposing Technical Specifi-cations for your facilities. You responded by letter datec I; arch 17, 1977, that fire protection Technical Specifications were not appropriate for your facilities. The Co, mission has determined that Technical Specifications for fire protection systems and ad=inistrative controls are necessary in order to ensure that adequate protection against fires is maintained curing j

all moces of facility coeration. Based on the Technical Specifications proposed by the other licensees of operating poner reactors and furtner i

review and consideration by us, we have revised the sample Technical Specifications and are enclosing a copy for your guidance.

These revisions do r.ot change the scope of the equipment or administrative controls covered by the previous sample fire protection Technical Specifi-cations. However, the action statements have been revised to describe core appropriate corrective measures to be taken in the event a licitino i-condition for operation is not met. There have also been changes in the surveillance frequency on son:e items for consistency with the overall systen surveillance schedule.

Open completion of our evaluation of the fire protection progra f or your facilities, the Technical Specifications for your facilities are to be revised to incorporate all elements of the final fire prctection systems and a6:ini-strative controls. Allowance will be made for nedifications t:iat reouire additional time to complete by making certain equip:nent or systea spcciti-cations effective at the timo such equipment is installea and operable.

i l-j Ir. the interim, until we are able to complete our evaluation of your fire O

protection suomittal, we will require fire protection Technical Specifics-p2 i

tions on tha existing fire protection equipr:cnt anc adainistrative controls ;r increfore, you are a. ain recuested to surit sucn orcrosu at your plent, J

E n.. ml { a. i L i ~. j - i... i i. E W. c i, n.

..y;_.

l8 0 0.910 0 g

=

.. */

1

=

?

JUN 241977 Co non.'ealth Edison Co pany

-2 1

letter. We expect your submittal to incluce all elements of these revised I

saaple Technical Specifications in the detail indicate.1 inclucing specific icentification of equipment such as snoke detectors. The only acceptable reason for not proposing a specific item given in tnese sample Technical C

Specifications would be that no such equipment or system presently exists Il at your facility.

In such cases where you depart from tne sample lechnical Specifications, state the justification in your applicatior..

Sincerely,

{'

Ori inal %ned by

}

W

$'?b i"

Don K. uavis, Acting Chief Operating Reactors Branch (2 Division of Operating 3ccctors

Enclosure:

Sampic Technical Specifications i

cc w/ encl:

See next page' DISTRIBUTION F

Dockets (7) l NRC PDRs (7)

Lo' cal PDRs (3)

~

ORB #2 Reading ORB #1 Reading RBevan P0'Connor GZech DKDavis RMDiggs SSheppard ASchwencer OELD OI&E (3)

TBAbernathy JRBuchanan-ACRS (16)

TJcarter l_

T Wa _ be f, 1

ffW b/n/7)

D.0 R..: 0.RB DOR:0RB.12.*j[' DOR:08

" 1..

D ORB.3 _._

DOP; SS (2. _

t

..,,c.,.

RBeyank[ P0'Connor:ro GZech.._ _.

ASchs.., er_ Dhvis

,v.

1 d /') 7 E' M /-O b d@LN

/_ /

i' fib.

/

NRC FORM 318 (9 76) NRCM 0240 W u. s. oovanmus=7 Paintino orric si te7e - eso-ea4 OO

m DO O

..N

.:1