_

_ _ _ _

. - -

- _ - _ - _ _ - _ _ _ _ _ - _ _ _

. - -

l

.-

.

e

. . . _

1

'

p

pf ~ Q: %Jn.

"

-

'

<c,

,.

.

'

~

UNITED STATES

'

NUCLEAR REGULATORY COMMISSION

-

\\

REGION lli

y

799 ROOSEVELT ROAD

GLEN ELLYN. ILLINOl$ 60137

MAR

6 E os

-

Co=======1 th Liie on t'a=p=ny

Docket No..'0-10-_

5

ATTE: Mr. Byrom Ime, Jr.

Dockat No.'50-237

Vice Prealdest

Docket No. 50-249

P.O. Bom 767

r%4====,

Y114 n=4 =

60690

Ges*1 ===== :

This refers to the taspection conducted by Mr. B. L. Jorg=a==a

,

and Dr. M. J. Oest==== of this office on Janiuury 27-30, and

'

Pobruary 2 and 13, 1976, of activities at the Dranden thu 1==e

Power Station aesthorized by Operating Lie ===== No. DPR-2,

No. DFR-19 and No. DPR-25, and to the discussion of our findings

with Mr. St

!---

_ and others of your staff at the canalusion

--

of the inspestion.

-

The ==-1===d espy of our inspection report identifies areas

====rin=d ds= ring the inspection. Within chase are.as, the

inspection consisted of a selective ====4n= tion of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompli==== with NRC requir===nts were iden-

tified within the scope of this inspection. However, the near

Generating Stations I:mergency Plan (CSD) has not Seen ade-

quately implemented at this tima. Speciffe=11y, those itens

identified and referenced further in paragraphs D and C under

Management Interview in the Stamary of Findings section of the

aa-1===d

inspection report require furthsr action. Please

inform this offies of the actions you are *=hinP or plan to

take to complate and consolidate iglementing procedures in

accordane= with CS U Section 10, and to provide adequate

temporary and per====nc site first aid f=eilities. Include

a completion date for each item.

In accordance with Section 2.790 of the PRC a "Ritles of

Practice," Part 2, Title 10. Code of Federsi ReCulations, a

!

copy of this latter and the enclosed inspection report will

l

be placed in the NRC's Public Doctament Poom, except as follows.

If this report containa information that you or your contracMrs

believe to be propriatary, you must apply in writing to this

i

/

[

0U00040 $ %

/

.

.

9

.

9

.

9

cousammenith mi- cm

-2-

MAR

8 1076

,

office, within twenty days of your receipt of this latter, to

withhold such information from public disclosure. The

appliention must includ= a full etatament of the ressoas for

whiah the information is considered proprietary, and should be

prepared so that proprietary information identified in the

appliestion is comemined in an ana1==ure to the application.

Unless we receive an application to withhold information or

are othouwise contested within the spesified tium period, the

written material id==e4 find in this paragraph will be p1===d

in the Publia Document Reem.

He will gladly dissues asur questions you have coneersing this

inspection.

Sincerely yours,

[

-

l

l

_

J. M. Allan, Chief

Fuel Facility and

Materials Safety Branch

Famineure:

IE Inspection Reports

No. 050-010/76-03,

No. 050-237/76-02 and

No. 050-249/76 02

l

es w/enel:

l

B. B. Stf - r, Station

Superintendent

t

bec w/ enc 1:

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.,

Attorney

HQ Reproduction

l