ML19340A721

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-010/74-02,50-237/74-01,50-249/74-01, 50-295/74-03 & 50-304/74-03 on 740305-06 & 11.No Noncompliance Noted
ML19340A721
Person / Time
Site: Dresden, Zion  
Issue date: 04/02/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Behnke W
COMMONWEALTH EDISON CO.
Shared Package
ML19340A722 List:
References
NUDOCS 8009030732
Download: ML19340A721 (2)


See also: IR 05000010/1974002

Text

---

- - - - . -_... - __ __

_ _ _ _ _

._ __

_

_ --

.

.

._

.. *

-

k W $ 2 & .e l

.p

.

.

,

g

UNITED STATES

'

p.

s

o

i

ATOMIC ENERGY COMMISSION

,

%rgs)ot *$g

)

OIRECTORATE OF REGULATORY OPERATIONS

REGION lll

~

799 ROOSEVELT ROAD

ygtgy,,oug

. !

, GLEN ELLYN. ILLINOIS 60137

Q12) 35s-asso

'

nD

i

D

\\)

DQk

APR 2

19N

f'-

_ _sith Edisco Company

ATTN:

W. B. Behnke

Docket No. 50-10

Docket No. 50-237

Eancutive Vice President

Post Office Box 767

Docket No. 50-249

Docket No. 50-295

Chicago, Illinois 60690

Docket No. 50-304

Gentlemen:

This refers to the inspection conducted by Mr. T. E. Vandel of this

office, at the Commonwealth Edison Company offices in Chicago, Illinois,

and to discussions of our findings with Mr. W. J. Shewski and others of

your staff on March 11, 1974. The inspection was an ==4== tion of the

corrective action outlined in your letter of December 10,1973, in

response to the RO:III letter of November 21, 1973. In regard to these

matters we have no further questions at this time.

A copy of our report of this inspection is enclosed and identifies the

.

areas avami==d during the inspection. Within these areas the inspection

consisted of selective ====4=mtion of procedures and representative

4

records and interviews with personnel.

,

By way of this letter we wish to confirm our understanding that the

'

Corporate Quality Assurance Manual applies to nuclear fuels procurement

activities.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter sad the

enclosed inspection report will be placed in the AEC's Public Document Room.

i

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written application to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure.

Any such application must include

a full statement of the reasons for which it is claimed that the information

is proprietary, and should be prepared so the proprietary information

identified in the application is contained in a separate part of the docu-

Unless we receive an application to withhold information or are

ment.

otherwise contacted within the specified time period, the written material

identified in this paragraph will be placed in the Public Document Room.

. I

r

i

l

8009030 7 3 2

_.

.

-

. ..

.

.

- .-.

-

.

- .

.

-.

\\

..

.

,

commonwealth Edison Company

-2-

APR 2

1974

~

No reply to this letter is necessary; however, should you have any

questions concerning this inspection, we will be glad to discuss

them with ycu.

Sincerely yours,

James G. Keppler

Rsgional Director

Enclosure:

RO Inspection Rpt No. 050-010/74-02,

No. 050-237/74-01, No. 050-249/74-01

No. 050-295/74-03 u d No. 050-304/74-03

_

bec:

R0 Chief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC

DTIE

OGC, Beth, P-506A

R. Renfrow, GC (2)

.

l