UNITED STATES
'
p.
s
o
i
ATOMIC ENERGY COMMISSION
,
%rgs)ot *$g
)
OIRECTORATE OF REGULATORY OPERATIONS
REGION lll
~
799 ROOSEVELT ROAD
ygtgy,,oug
. !
, GLEN ELLYN. ILLINOIS 60137
Q12) 35s-asso
'
nD
i
D
\\)
DQk
APR 2
19N
f'-
_ _sith Edisco Company
ATTN:
W. B. Behnke
Docket No. 50-10
Docket No. 50-237
Eancutive Vice President
Post Office Box 767
Docket No. 50-249
Docket No. 50-295
Chicago, Illinois 60690
Docket No. 50-304
Gentlemen:
This refers to the inspection conducted by Mr. T. E. Vandel of this
office, at the Commonwealth Edison Company offices in Chicago, Illinois,
and to discussions of our findings with Mr. W. J. Shewski and others of
your staff on March 11, 1974. The inspection was an ==4== tion of the
corrective action outlined in your letter of December 10,1973, in
response to the RO:III letter of November 21, 1973. In regard to these
matters we have no further questions at this time.
A copy of our report of this inspection is enclosed and identifies the
.
areas avami==d during the inspection. Within these areas the inspection
consisted of selective ====4=mtion of procedures and representative
4
records and interviews with personnel.
,
By way of this letter we wish to confirm our understanding that the
'
Corporate Quality Assurance Manual applies to nuclear fuels procurement
activities.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter sad the
enclosed inspection report will be placed in the AEC's Public Document Room.
i
If this report contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written application to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure.
Any such application must include
a full statement of the reasons for which it is claimed that the information
is proprietary, and should be prepared so the proprietary information
identified in the application is contained in a separate part of the docu-
Unless we receive an application to withhold information or are
ment.
otherwise contacted within the specified time period, the written material
identified in this paragraph will be placed in the Public Document Room.
. I
r
i
l
8009030 7 3 2
_.
.
-
. ..
.
.
- .-.
-
.
- .
.
-.
\\
..
.
,
commonwealth Edison Company
-2-
APR 2
1974
~
No reply to this letter is necessary; however, should you have any
questions concerning this inspection, we will be glad to discuss
them with ycu.
Sincerely yours,
James G. Keppler
Rsgional Director
Enclosure:
RO Inspection Rpt No. 050-010/74-02,
No. 050-237/74-01, No. 050-249/74-01
No. 050-295/74-03 u d No. 050-304/74-03