Text

__

. _ _ _

'

f

k

L),,LJ

p ilt c ,

a

,

UNITED STATES

.W{g.

ATOMIC ENERGY COMMISSION

-

i

^Q y

DIRECTORATE OF REGULATORY OPERATIONS

.

J

REGION Ell

. 8Fil 4' $

U

799 ROOSEVELT ROAD

TELEPHONE

GLEN ELLYN, ILLINOIS 60137

(312) 858-2660

OCT 3 1 1974

Commeonwealth Edison Company

Dookat No. 50-10

ATTH:

Mr. Byron Lee, Jr.

Vice President

P.O. Box 767

Chicago, T114nais

60690

Gentlemen

'

This refers to the inspection conducted by Mr. C. Wi114m== of this

office on October 3, 1974, of activities at Dresden Unit 1 authorized by

AEC License No. DPR-2 and to the discussion of our findings with Mr. B.

Stephenson and others of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

_

areas amanined during the inspection. Within these areas, the inspection

consisted of a selective ====ination of procedures and representative

records, interviews with plant personnel, and observations by the inspector.

No violations of AEC requirements were identified within the scope of

this inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part

2, Title 10, code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room. If this report contains any information that you or your contractors

believe to be proprietary, it is necessary that you make a written

, application to this office, within twenty days of your receipt of this

letter, to withhold such information from public disclosure. Any such

application must include a full statement of the reasons for which it is

claimed that the information is proprietary, and should be prepared so

the proprietary information identified in the application is cournin=d

in a separate part of the document. Unless we receive an application to

withhold information or are otherwise contacted within the specified

time period, the written material identified in this paragraph will be

placed in the Public Document Room.

.8000020 h/6

-

_ .

.

.

_

-

.

_

,

.

OCT 31 1974

.

.

Commmonwealth Edicon Company

-2-

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sineavely yours.

James G. Keppler

Regional Director

Enclosure:

RO Inspection Rpt. No.

050-010/74-11

bec: RO Chief, FS&EB

RO:HQ (4)

_

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC