Forwards Insp Repts 50-010/74-13 & 50-010/74-09 on 740910- 12,14,18,21,23-25,28,1001,02,21 & 29.Noncompliance Noted
ML19340A671
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/26/1974
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19340A673 List:
References
NUDOCS 8009020607
Download: ML19340A671 (2)


See also: IR 05000010/1974013

Text

_-.

.-

-- _

. _

_ -

_ _ _ . -

. _ - _

,

.,,

att cg

L

U

'

3'~

UNITED STATES

' .' G ,

l.]

ATOMIC ENERGY COMMISSION

g

y

DIRECTORATE OF REGULATORY OPERATIONS

-

g

REGION 111

t

Q

v

her,g en

799 ROOSEVELT ROAD

TELKPHONE

GLEN ELLYN, ILLINOIS 60137

(382) 856 2660

,-

DEC 2 6 1974

\\

F W th Edison Company

Doeket No. 50-10

,

ATTE: Mr. Byron Lee, Jr.

Docket No. 50-237

Vice President

P. O. Box 767

Chicago, T111nnia

60690

I

Gentlement

This refers to the inspection conducted by Messrs. Maura, Cook, Williams,

Erb, and other members of this office, September 10-12, 14, 18, 21, 23-

25, and October 1, 2, 21 and 29, 1974, of activities at Dresden Units 1

and 2 authorized by AEC Operating Licenses No. DPR-2 and No. DPR-19 and

to the discuesion of our findings with Messrs. Stephenson, Roberts and

Diederich throughout the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas ===inad during the inspection. Within these areas, the inspection

-

consisted of a selective enmination of procedures and representative

l

records, interviews with plant personnel, and observations by the inspectors.

l

During this inspection, it was found that certain of your activities appear

,

to be in violation of AEC requirements. The items and reference to the

i

'

pertinent requirements are listed under Enforcement Action in the Summary

of Findings Section of the enclosed inspection report. Prior to the

conclusion of the inspection, the inspector determined that corrective

',

'-

action with respect to Item B had been taken, and consequently, we have

no further questions regarding this matter at this time.

This notice is sent to you purs Jant to the provisions of Section 2.201

of the AgC's " Rules of Fra:tice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

twenty days of your receipt of this notice, a written statement or

explanation in reply, including

(1) corrective steps which have been

taken by you, and the results achieved; (2) corrective ateps which will

i

be taken to avoid further violations; and (3) the date when full coe-

pliance will be achieved. Such a statement or explanation should be

provided for Enforcement Item A.

,

.8009020[C7

..

_.

. .

__.

.

-

. -_

.

- - - -

.

. _ .

. _ .

.

.-

-

.

..

._.

.-

'

.

D*"]D

"

]D

' T { $

'

.

o o Ju

o Ju.

uR&h

Comme ==alth Edison Company

-2-

DEC 28 1974

.

. .

In accordance with Section 2.790 of the AEC's " Rules of Practice." Part 2,

<

Title 10, Code of Federal Regulations, a copy of this notice, the --1a=ed

inspection report, and your response to this notice will be placed in the

AEC's Public Document Room. If this report contains any information that

you or your contractors believe to be proprietary, it is necassary that you

make a written application to this office, within twenty days of your receipt

of this notice, to withhold such information from public disclosure. Any

such application must include a full seatsment of the reasons for which 1

is claimed that the information is proprietary, and should be prepared so

the proprietary information identified in the application is contained in

a separate part of the doc u ent. Unless we receive an application to withhold

'

information or are otherwise contacted within the specified time period, the

written meterial identified in this paragraph will be placed in the Public

Document Room.

The inspection inr1=I=I a review of the Unit 1 control rod drive uncoupling

problem. Following your investigation and corrective action, this office

confirmed with our Headquarters that no restriction on startup was in

effect. This metter is referenced in our letter to you dated August 15,

1974.

,

-

!

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

p

Sincerely yours,

.

Gaston Fiore111, Chief

1

Reactor Operations Branch

Enclosures

RO Inspection Reports No. 050-010/74-13

and No. 050*-010/74-09

cc: Mr. B. B. Stephenson

Station Superintendent, w/ enc 1.

bec:

R0 Chief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.

-

. -

.

_

.-

..

.-

__

--

-.