Text
- .-
.
. - .
-
-
-
.
.
gm0
- D
' Tl
e J\\ d
1
e
,
,e
UNITED STATES
.
NUCLEAR REGULATORY COMMISSION
,
REGION IH
799 ROOSEVELT ROAD
(
GLEnd ELLYN, ILLINOIS 60937
DEC 2 4 19(b
Comunonwealth Edison Company
Docket No. 50-10
ATIN: Mr. Byron Lee, Jr.
Vice Frosident
F. O. Box 767
Chicago, Illinois
60690
Gentlement
This refers to the inspection conducted by Messrs. Lee and-
Kay of this office on November 24-26, and December 15, 1975,
of activities at Dresden Maclear Power Station Unit 1 author-
ised by NEC Operating License No. DPR-2 aral to the discussion
of our findings with Messrs. Stephenson and Abel and others
of your staff at the conclusion of the inspection.
_
A copy of our report of this inspection is enclosed and identi-
fies the areas exm=fnad during the inspection. Within these
areas, the inspection consisted of a selective exaninstion of
procedures and representative records, interviews with plant
personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identi-
fied within the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the enclosed inspection report will
be placed in the NRC's Public Document Room. If this report
contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written
application to this office, within twenty days of your
receipt of this letter, to withhold such information from
public disclosure. Any such application must include a full
statenient of the reasons for which it is claimed that the
information is proprietary, and should be prep = red so tho
.8008280 C p
JD
. -
..
.
.
D**]D *]D'd3 'N ,{\\ [l
6 o JB e
JU.
.n\\L
.
.,
.
ut,C 2 4 1elb
Commonwealth Edison
-2-
Company
i
I
proprieu ry information identified in the application is
contained in a separate part of the document. Unless we
receive an application to withhold information or are other-
wise contacted within the specified time period, the written
material identified in this paragraph will be placed in the
Public Document Fmon.
No reply to this letter is necessary; however, should you
have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
~
Gaston Fiore111. Chief
Emactor Operations and
Nuclear Support Branch
Enclosure
IE Inspection Report
No. 050-010/75-21
cc w/ enc 1:
Mr. B. B. Stephenson
Station Superintendent
bec w/ enc 1:
Local PDR
Anthony Roisman, Esq.