| Site: | Dresden |
| Issue date: | 06/03/1975 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19340A557 | List: |
| References | |
| NUDOCS 8008270815 | |
| Download: ML19340A556 (2) | |
See also: IR 05000010/1975008
Text
-
- - . .
-
. . . - - -
-
-
-
.
-
. .. . -
- , . . - . .
.
"
l
_
,
,
.
- - - .
,- .
. - - .
- *
'
UAITED STATES
(/
a
,
NUCL. .'rY-REGULATORY CO.AMISSION
REGION lli
.
m
'
I
GLEN ELLYN. ILLINOIS 60137
~
!
_ JUN
3 1975
-
Commonwealth Edison Company
Docket No.
50-10
'
ATIN:
Mr. Syron Lee, Jr.
Docket No.
Vice President
Docket No.
50-249
P. O. Box 767
Chicago, Illinois
60690
Gentlemen:
~
This refers to the inspection conducted by Mr. Jorgensen of this office
-
on May 9, 13 and 14, 1975 of activities at the Dresden Nuclear Power
Station Units 1, 2 and 3 authorized by NRC Operating Licenses No. DPR-2,
. No. DPR-19 and No. DPR-25 and to the discussion of our findings -d jih Mr.
Butterfieln and others of your staff at the conclusion of the inspection.
A copy of our report of this inspectica is enclosed and identifies the
_
areas emined during the inspection. Within these areas, the inspection
consisted of a selective er=4 nation of procedures and representative
-'
records, interviews with plant personnel, and observations by the
'
inspector.
_
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
j
2, Title 10, Code of Federal Regulations, a copy of this letter and the
l
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you or your contractors
'
believe to be proprietary, it is necessary that you make a written
_
application to this offf.ce, within twenty days of your receipt of this
'
j
letter, to withhold sr.ch information from public disclosure. Any such
application must include a full statement of the reasons for which it is
'
claimed that the information is proprietary, and should be prepared so
the proprietary information identified in the app'lication is contained
in a separate part of the document. Unless we receive an application to
withhold information or are otherwise contacted within the specified
time' period, the written material identified in this paragraph will be
placed in the Public Document Room.
.
LUTro9
Cn
9
.
-
%
$
~
,6oosog j
%e
.
.
.
. - - - -
,
.
.
.
.
JUN
3 1975
.
,,
t
-
Commonwealth Edison Company
-2-
-
.
No reply to this letter is necessary; however, should you have any
questions concerning this inspection, we will be glad to discuss them
with you.
Sincerely yours,
Gaston Fiorelli, Chief
Reactor Operations Branch
)
Enclosure:
,
IE Inspection Rpts No. 050-10/75-08,
No. 050-237/75-13 and No. 050-249/75-11