ML19340A349
| ML19340A349 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/04/1972 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8003250622 | |
| Download: ML19340A349 (2) | |
Text
....
- ~....
AEC DISIRIBUTION FOR PART 50 DOCKET MATERIAL I
(TEMPORARY FORM)
CONTROL NO: 4490 FILE FROM:. Florida Power, Corp.
DATE OF DOC:
DATE REC'D LTR MEMO RPI OTEER S t. Petersburg, Fla.
J.T. Rodgers 8-4-72 8-15-72 X
~
TO:
/
^
SEhT LOCAL PDR V
Mr. R.C DeYoung 1 signed CLASS:
OP INFO INPUT NO CYS REC'D DOCKET NO:
1 50-302 DESCRIPTION:
Ltr re our 7-24-72 ltr.....
ENCLOSURES:
~
cdv that applicant can't respond by due date of 8-18-72....ady that 10-16-72 is earliest date that they can respond to info req in our 7-24-72 ltr.....
DO NOT REiDE f
PLANT NAMES:
Crystal River Unit 3 I
FOR ACTIO:i/INFORMATION DL d-O-M BUTLER (L)
ElIEL(L)
VASSALLO(L)
ZIEMANN(L)
EiIGHTON(ENVIRO) ~
W/ Copies W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
/SCHWENCER(L)
H. DEICON CHITROOD(FM)
W/ Copies W/ 2 Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
STOLZ(L)
SCHEMEL(L)
DICKER (EINIRO) i W/ Copies W/ Copies W/ Copies W/ Copies W/ Copies INIT.R?IAL DISTRIEUTION b FID J'ECH REVIEW VOLI2GR HARLESS WADE 1
W2C PDR YHENDRIE DEICON pHAFER OGC, ROOM P-506A SCHROEDER GRD'ES F&M FBROWN MUNTZnn/STlFF MACCARY GAMMILL SMILEY CASE LANGE KASTNER NUSSBAUMER A/T IND dIAMBUSSO PAWLICKI BALLARD ERAITMAN BOYD-L(BWR)
SHAO FIRE LIC ASST.
SALTZMAN 36EYOUNG-L(FWR)
KNUIH FSERVICE SKOVHOLT-L STELID JJNIRO MASON FLANS i
P. COLLINS MOORE FMULLER WIISON h;CDONALD THOMPSON DICKER KARI DUBE FEG OPR TEDESCO KNIGHTON SMITH l
NILE & REGION (2)
IONG YDUNGBIDOD GEARIN C. MILES MORRIS LAINAS PROJECT LEADER DIGGS STEELE BENAROYA m'IS EXTF2daL DIS 2RIEUfIDN
~
N-ICCAL PDR Crystal River, Fla.
s.%
1-IEIE(LAUGHLI:i)
(1)(5X9)-NATIONAL LAB'S 1-FDR-SAN /LA/NY l-NSIC(BUCHANAN)
ANL/ORNL/FNL
- 1. GERALD LELLUCHE l
l-ASLB-YORE /SAYRE l-R. CARROLL-0C, GT-3327 ER00KHAVEN NAT. IAB LOODUARD/R.ST.
1-R. CATLIN, A-170-GT 1-BOLAND, IDAHO FALIS,
}
6-CYS ACES HOLDING l-CONSULAIE'S IDAH0(50-331Only) i NEKMARK/BLUME/AGABIAN 1-RD.. WLLER. F-309GT
.8003250 N N Al
.~
FLORIDA POWER C O R P 0 H ATI O N ST. PETERSBU RG FLORIDA Repat:0 Rs C6 August 4, 1972 Mr. R. C. DeYoung Assistant Director for 5-Pressurized Water Reactors
.-J.
Directorate of Licensing
/' '.i 'N United States Atomic Energy Commission
/
Washington, D. C.
20545 v'
g
.~
/'
In re: Florida Power Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 5f'-302
Dear Mr. DeYoung:
This is to respond to your letter of July 24, 1972, with the enclosure Request For Additional Information, Florida Power Corporation, Crystal River Unit 3, Docket No. 50-302.
We have assessed the time necessary for us to supply the required information and find that we cannot respond by the requested August 18, 1972 date. Due to the lengthy calculations required, involving also the model descriptions, we find that October 16, 1972, is the earliest date that we can reasonably supply the requested information.
However, as you noted in your letter of July 24, these items may have a potentially significant effect on continued construction. With this in mind, we request a meeting as soon as possible to discuss these items with you.
The object would be to gain mutual understanding of the problems and possible solutions at the earliest date in order to avoid any future events which might affect the successful construction and operation of Crystal River Unit 3.
Please contact us if you desire further clarification or discussion and to select a mutually agreeable meeting dct.e.
Yours very truly,
@lm G
' Q'
~
Db J.
Rodger
/g M
Assistant Vice President and Nuclear Project Manager f
A UG ; 'z,
JTR/sik k
p._,,,
t ?7164 Edidid$ pl/ g g
4430 EU