r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-287 REC: CASE E G ORG: PARKER W O DOCDATE: 02/08/78 NRC DUKE PWR DATE RCVD: 02/13/78 DOCTYPE: LETTER NOTARIZED: YES COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 40 LICENSE NO DPR-47 APPL FOR AMEND: TECH PROPOSED CHANGE CONCERNING TEMPORARY EMERGENCY EXTENSION OF ALLOWABLE TIME FOR MAINTANCE TO ALLOW CONTINUED UNIT OPERATION AT FULL PWR FOR AN ADDL 48 HOURS TO REPAZR VALVE 3BS2..NOTORIZED 02/08/78.

PLANT NAME: OCONEE - UNIT 3 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:

o**************** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

NOTES:

1.

M.

CUNNINGHAM - ALL AMENDMENTS TO FSAR AND CHANGES TO TECH SPECS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIEUTION CODE A001)

FOR ACTION:

Bppro

_ __ _ - ' ENCER**W/7 ENC ZNTERNAL:

'"'r**~"

~

NRC PDR**W/ ENCL I L E**W/2 ENCL OELD**LTR ONLY HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAO**W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL GRIMES **W/ ENCL J COLLINS **W/ ENCL J.

MCGOUGH**W/ ENCL EXTERNAL:

LPDR'S WALHALLA. SC**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL 8001310 db//

DISTRIBUTION:

LTR 40

. ENCL 39 CONTROL NBR:

!Qill0.43 SIZE: 2P+1P

\\

looo*+o*****************************

THE END

                                                                    • y sk 04 w

mpg

S 43 DUKE power COMPMY Powra Duttotwo 422 sourn causcu stazer,cuntorrgg n

WI L LI A84 3. PA R R C R..J R.

WCE PersiatNt Tratemon t:Asta 7C4 5ttau Pocouct om 373-4083 February 8, 1978 f'

N

\\

,jj"]

Mr. Edson G. Case, Acting' Director n,,

r Office of' Nuclear Reactor Regulation U.

S.' Nuclear Regulatory Commission FI3.'.

s,7.

Washington, D. C.

20555 9.s. sucen "

c::n a

Mt Saslan Re:

Oconee Unit 3 Docket No. 50-287

[, '

KQ,r

Dear Mr. Caae:

Technical Spec.ification 3.3.4 requires tho trains of Reactor Building

~

spray to be operable. Valve 3BS2 failed a surveillance test in that it failed to operate.

This made one train of Reactor Building spray inoperable. At the'end of the allowed 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> maintenance period, the valve was not repaired.

It is expected to be repaired by 6 p.m.,

February 9, 1978. An emergency temporary extension.of the allowable time for maintenance is requested to allow continued unit operation at full power for an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to repair valve 3BS2.

This extension is considered reasonable in that the redundant 'eactor R

Building spray train was verified op.erable and all containment cooling systems are operable.

The unit is considered to be protected under all accident conditions. By-Standard Technical Specifications for Babcock and Wilcox Pressurized Water Reactors, one Reactor Building spray system train is authcrized to be inoperable for periods up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Additionally, an analysis.was performed and submitted as Supplement 13 to the FSAR which states in part that without Reactor Building spray and only two coolers operable, a maximum building pressure of 53.8 psig was obtained." This maximum pressure is below the design

. pressure of the Containment Building.

The Nuclear Safety Review Board-reviewed this proposal and approved it based on review of the FSAR, Standard Technical Specifications, and the probability.of an'accidene. occurring during the extension period requested is very:small.

~'

Ve truly yours A' m.

/

s w.

y williamO. Parker,;(r.[

g k /

~

R1.civr-1

~4 F

jF

n.

~

Mr. Edson G. Case Page 2

' February 8, 1978 NILLIAM O. PARKER,'JR.,'being duly sworn, states that he is Vice President of Duke' Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission-this request for.

amendment of the Oconee Nuclear Station Technical Specifications, Appendix A'to Facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements.and matters set forth therein are true and. correct to the best

- of h s knowledge..

j

/

/

v Q G A t)./Lku

,o.

William O. Parker, Jr.V Vice President Subscribed and sworn to before me this 8th day of February, 1978.

b MUAL b.

asw)

Notary Public My Commission Expires:

Februarv 15,- 1982

.,