7 NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO: lo Y I b FILE:
FROM: Duke Power Company DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charlotte, NC A C Thies 6-10-15 6-12-75_
XXX i
TO:
ORIG CC OTHER SENT tmc PDR_
YT Mr. Giambusso i signed SENT LOCAL PDR XX CLASS-UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXXXXI 1
50-287
-DESCRIPTION:
ENCLOSURES:
Ltr re 3-12-75 inspection..... furnishing info & results of inspection of the reactor DO c,._
my
~w<E building......
ACp- :~ ' ~a~uED PLANT NAME: Oconee #3 FOR ACTION /INFORMATION 6-14-75 ehf BUTLER (L)
SCHWENCER (L) ZiEMAWN (L)
REG AN (E)
W/ Copies W/ Copies W/ Copies W/ Copies Cl. ARK (L)
STOLZ (L)
DICKER (E)
LE AR (L)
W/ Copies W/ Copies W/ Cc;:ies W/ Copies PARR (L)
V ASSALLO (L)
KNIGHTON (E) s?I.s W/ Copies W/ Copies W/ Copics W/ Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E)
Lnt W/ Copics
' W/fCopies W/ Copies W/ ~Cooies INTERNAL DISTRIBUTION s
f REGn!'h TECH REVIEW DENTON LIC ASST A/T IN D_.
/ ""!TC PD C SCHROEDER GRIMES R. DIGGS (L)
B R AITM AN OGC. ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)
SALTZMAN f GOSSICK/STAF F KNIGHT KASTNER E. GOULBOURNE (L)
MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. MAIGRET (L)
MCDC'NALD MOORE (L)
HOUSTON ENVIRO S: REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
S E. COU PE
/. SHEPPARD (L)
SKOVHOLT (L)
ROSS DICKER GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE LONG REGAN S. TEETS (L)
KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
' file & REGION (2)
BENAROYA f4. 40 --
V. WILSON (L)
WIGGINTON MIPC VOLLMER
, HAR LESS R. INGRAM (L) y M. DUCCAM h :<.)
1/
EXTERNAL DISTalGUTION
- +
/ - LOCAL PDRJAlellsLle [I. C-1
/1 - TIC (ABERNATHY) (U(2)(10) - NATIONAL LABS 1 - PDR-SAN /LA/NY
,1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E.201 GT 1 - SROOKHAVEN NAT LAS 1-ASLB 1 - CONSU LT ANTS 1 - G. ULRIKSON ORNL 1 - Newton Amierson NEWMARK/BLUME/AGBABI AN
- -td-ACRS E FMENT 7 g : i. 4 sA< n. J 8001140
O A
DUKE POWER COMPANY Powra Burz.orwo 4aa SouTu Cnunca StazzT, CuAmroTTz, N. C. asaos
/;,G-
,'N
- p. o. sax a 7e
- 4. c. THits f
g,, n,\\
sanion vica PaaSioaNT PRODUCitOM AND TR ANSMISSION v
/
Q;(,
/
.m g3 *-',
June 10, 1975
~l f
..y
- g., 8 yT-) v d, ',,f '. / ' 'y x
n N
s.
Mr.'Angelo Giambusso, Director bd/
l2 'h,4
/C Division of Reactor Licensing.
F,j Washington, D. C.
20555 fg/.,
U. S. Nuclear Regulatory Commission
- c l
\\,;
~
Re: Oconee Unit 3
\\~~
. '2 k'-
-s~
'~
Docket No. 50-287 y
N.
Dear Mr. Giambusso:
On March 12, 1975, the annual inspection of oconee Unit 3 Reactor
' Building was completed, pursuant to Technical Specification 4.4.1.4.
l The inspection was performed in accordance with approved test pro-l cedure PT/0/A/0150/16, Reactor Building Inspection Test.
l A visual examination was made of accessible interior and exterior surfaces of the containment structure and its components.
The following are discrepancies found during the inspection:
I 1.
Tendon grease seepage through construction joints was observed at three exterior locations on the Reactor Building.
The test pro-cedure was revised to require inspection of these areas on an annual basis.
2.
Several tendon grease caps were found to have grease leakage around caps and filler plugs.
Each was repaired by applying a sealant tape to the grease plug threads and retorquing the bolts.
l 3.
Surface cracks were found on the bottom surface of the Reactor Building base slab.
These cracks appear to be shrinkage cracks and have not shown any displacement. The test procedure was revised to require inspection of these areas on an annual basis.
i l
4.. Two mechanical penetrations were found to have stem packing leaks.
Each was repaired.
i
~
The interlock mechanism on the inner dcor of the personnel hatch 5.
was found to be bent. This did not prevent the interlock from operating properly. The interlock mechanism has been repaired.
8413
l 3
t
=
I' l
Mr. Angelo Giambusso Page 2 June 10,1975 i
l From this inspection, no evidence of deterioration was found which could affect the containment's structural integrity or leak-tightness.
Very truly yours, A. C. Thies ACT:vr l~