ML19340A203
| ML19340A203 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/07/1975 |
| From: | Parker W DUKE POWER CO. |
| To: | Rusche B US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001140810 | |
| Download: ML19340A203 (3) | |
Text
~
o.
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL
' (TEMPORARY FORM)
CONTROL NO:
10787 FILE:
a FROM: Duke Power Co.
DATE OF DOC DATE REC'D LTR lTWX RPT OTHER Charlotte, N.C.
William O. Parker, Jr 10-7-75 10-9-75 m
TO:
ORIG CC OTHER SENT NRC POR vvv Mr. Benard C. Rusche 1-signed SENT LOCAL PDR m
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
'1 50-287 xm DESCRIPTION:
ENCLOSURES:
Ltr re their 9-12-75 Itr..... requesting cpproval for the proposed Tech-Spec change be granted by 12-1-75 concerning Unit 3
, Fuel Storage Facility....
Oconee. Nuclear Plant #3 FOR ACTION /lNFC RMATION 10-14-75 JGB BUTLER (L)
SCHWENCER (L) ZlEMANN (L)
R EG AN (E)
REID(L)
W/ Copies W/ Copies W/ Copies W/ Copies W/ COPIES CLAR K (L)
STO LZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E) sPIIs W/ Copies AN/ Copies W/ Copies -
W/ Opies j
KNIEL (L)
V PURPLE (L)
YOUNGBLOOD (E)
LpH
)
W/ Copies W(, Copies W/ Copies W/ copies INTERNAL DISTRIBUTION MifM FH Cl TECH REVIEW DENTON LIC ASST A/T IN D.
MHC PDR SCHROEDER GRIMES R. DIGGS (L)
BRAITMAN JDGC, ROOM P.506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN yGOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L)
ME LTZ CASE PAWLICKl BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STC.LLO M. RIL7dBR00K(L)
MCDONALD MOORE (L)
HOUSTON E NVI'iO_
S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MUt LER M. SERVICE (L)
DUBE (Ltr)
SKOVHOLT (L)
ROSS DICKER gtHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO LLINS TEDESCO YOUNG BLOOD H. FMITH (L)
HARTFIELD (2)
DENISE J. COLLINS EGAN S. T EETS (L)
KLECKER MG OPR LAINAS JE)3T LDR G. WILLI AMS (E)
EISENHUT NLE & REGION (2)
BENAROYA
/r W V. WILSON (L)
WlGGINTON MIPC VOLLMER H AW ESS R. INGR ' 94 (L) 1 M. DUNCAN (a EXTEhNAL DISTRIBUTION
[- LOCAL PDR Walhalla, S.C.
/ TIC (ABERNATHY) (1)(2)(10) - NATIONAL LABS 1 - PD R. SAN /LA/NY
'NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E.201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /BLUME/AG BABI AN g / La
- ACRS N/SENT b
to L $
jf;,;.,
f 8001140
[
p
~~
X s
.s
~
DUKE POWER COMPANY gp.
POWER StHLDING 422 SocTu Cuencu StazzT, CnAntoTTs. N. C. 2sa4a WI L LI AM O. PA R KER, J R, MCC Pe tSic tas?
TELEPacmg; AaEA 704 Seta= P=ooucT>oie p
37 3-4C 8 3
,4:.1W.
October 7, 1975 Av^Ws j; '
-;, g
.. s
(.3 3
~
Mr. Benard C. Rusche Director of Nuclear Reactor Regulation
.+
U. S. Nuclear Regulatory Commission Ma
/,' ~
~~
Washington, D. C.
20555
---O Atcention:
Mr. R. A. Purple, Chief Operating Reactors Branch #1 Re: Oconee Nuclear Station Unit 3 Docket No. 50-287
Dear Mr. Rusche:
My letter of September 12, 1975, requested an amendment of the Oconee Nuclear Station Unit 3 Facility Operating License.
The proposed amendment relates to a modification of the Unit 3 Fuel Storage Facility and a related Technical Specifications change.
The proposed modification involves replacing the existing fuel ~ storage rack with the Combustion Engineering, incorporated, supplied High Capacity Fuel Assembly Storage Rack and consists of three phases:
removal of the existing rack, installation of the new rack, and utilization of the new rack. We have performed an evaluation to determine if the propcsed ;nodification involves an unreviewed safety question. The processes of cemoval of the existing rack (spent fuel has not been stored in Unit 3 spent fuel pool) and the installation of the new rack are determined not to involve any unreviewed safety questions.
However, utilization of the new rack may constitute an unreviewed safety question in that the proposed modification involves a change in the effective multiplication factor (k-effective) of the fuel to be stored from the present value of less than 0 9 to a value of less than 0 95 (meeting the requirement of Criterion 5.7 4.1 in ANSI N18.2-1973). Therefore, if the Comission deems it necessary to declare the proposed license amendment to involve an unreviewed safety question in order to act' on Duke's request, it may be treated as such.
As indicated in my September. 12, 1975 letter, this modification is to be effected prior to the Unit 3 refueling, which is scheduled for September, 1976.
In. order to meet that schedule, we plan to proceed to 10787
j.
i~
l;'
e ',
l.
Mr. Benard C. Rusche Page 2 October 7,1975 l
to remove the existing rack beginning Decembe: 1, 1975 We request that i
approval for the proposed Technical Specif7. cations change be granted by December 1,1975
.n l
Very ruly yours, /
I 4~. L d.
Illiam 0.' Parker, Jr.
l l
l PMA:vr l
l I
i.
.