ML19340A161

From kanterella
Jump to navigation Jump to search
Submits Fuel Clad Creep Collapse Analyses.Predicted Assembly Power History Described in 750131 BAW-10084P-A.Requests Deletion of Restriction in Tech Spec 3.11 Limiting Number of Effective Full Power Days
ML19340A161
Person / Time
Site: Oconee 
Issue date: 04/16/1976
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
References
NUDOCS 8001100630
Download: ML19340A161 (4)


Text

u.s. NUCLliAR RE1ULATORY COMMIST N DOCKET NUM8E R NRC FIRM 195

,$'O-2 g 7 42 7el NRC DISTRIBUTION FOn PART 50 DCCKET MATERIAL TO:

r lascM:.

FROM: Ouke Power Occpany DATE OF DOCUMENT 0-10-7D Charlo;te, ::C L' C 2arker Jr DATE RECEIVED

--23-7b CLETTER E NOTORIZE D PROP f NPUT FORM NUMBER OF COPIES RECEIVED CORICINAL E U NC LASSIF;E D l

OCOPy 3 signed DESCRIPTION ENCLOSU RE F

L: :::cr ced

-ic-76....furnishin; infD :en-

nr:.n; aximum pcwar restrictions limits ring first fuel cy la
eratten.............

)

PLANI NAME:

Cc; tee M J

SAFETY FOR ACTION /INFORMATION ENVIRO

-2 4

,e

.i ASSIGNED AD :

ASdIGNED AD :

lf BRANCH CHIEF :

po r o /.e.,

(s)

BRANCH CHIEF :

/

PROJECT MANAGER:

Z eL/,

PROJECT MANAGER :

'/

LIC. ASST. :

S6uyL LIC. ASST. :

INTERNAL DISTRIBUTION m

/l " C ?!LE 3

SYSTEMS SAFETY PI. ANT RYSTEMS rwTun wen

i/

NRC PDR -

HEINEMAN TEDEscn ERN5T 1

iIf I&E (3)

ScMROEDER BENAROYA l

BALLARD

/

OELD LAINAS SPANGLER

./

GOSSICK & STAFF ENGINEERING IPPOLITO SITE TECH MIPC MAccAny CASE KNIGHT OPERATING REACTORS GAMMILL HANAUER SIHWEIL STELLO STEPP HARTRSS PAWLICKI HUU4AN OPERATING TECH PROJECT MANAGEMENT REACTOR SAFETY

/

EISENHUT SITE ANALYSIS BOYD ROSS

/

SHA0 VOLLMER j

P. COLLINS NOVAK

-/

BAER BUNCH HOUSTON ROSZTOCZY

/

SCHWENCER J. COLLINS PETERSON CHECK

/

GRIMES KREGER MELTZ HELTEMES AT & I SITE SAFETY & ENVIRC SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER EXTERNAL DISTRIBUTION CONTROL NUMBER

/

LPDR: Lt/a / Aa #.. S C NATL LAB BROOKHAVEN NATL LAB

/

TIC REG. V-IE ULRIKSON(ORNL)

/

NSIC LA PDR

{

{[

ASLB CONSULTANTS f__

1

/

ACRS $ "T_",EM/SENr ta A A $ 6 c c.. 2 50011006_5()

I' NTC FOTM 19512 76)

m m

DUKE POWER COMPANY Powra Butt.ntxo m

422 Sourn Cnuacu Srnzer Caunt.orTz N. C. 2e242 April 16, 1976 mum o nauca. sa.

Vic t Dets cEast f tttp**O*et: An ta 70 4 S rcana Pacouctio 3 7 3-4c e 3

  1. ,i>

f Mr. Benard C. Rusche

'D Director of Nuclear Reactor Regulation g

---jg

/

f, \\~.1,

,4 U. S. Nuclear Regulatory Commission j

4 k.,y'%,.d, 7

g.. L.

C

\\'

(4 Washington, D. C.

20555

/

4, - )

.n a

~m-Re: Oconee Unit 3

( p (,,; ., y,g

'S

< %'*' N%s 1) h7' --

Docket No. 50-287 9'.

i, b

^

Dear Mr. Rusche:

J kJ/,

0 4 ! 2 The Oconee Nuclear Station Technical Specification '.

, ' ~. ximum Power v '

i Restriction,'.' limits the first fuel cycle operation of Oconee Unit 3 to

(

10,944 EFPH until supporting analyses and data pertinent to fuel clad creep collapse under fuel densification conditions could be obtained to justify full three cycle operation. This analysis has now been completed, and it has been determined that creep collapse will not occur during the projected three cycles of operation.

The fuel clad creep collapse analyses were performed for three-cycle assembly power histories. The predicted assembly power history was used to determine the collapse time as described in the Babcock and Wilcox Company report BAW-10084P-A, January 1975, " Program to Determine In-Reactor Performance of B&W Fuel-Cladding Creep Collapse". A summary of the conservatisms employed in the analytical procedure is presented below:

1 1.

The CROV computer code was used to predict the time to collapse.

CROV conservatively predicts collapse times, as demonstrated in BAW-10084P-A.

2.

No credit is taken for fission gas release. Therefore, the net differential pressures used in the analysis are conservatively high.

3.

The cladding thickness used on the LTL (lover tolerance limit) of the as-built measurements.

The initial ovality of the cladding used was the UTL (upper tolerance limit) of the as-built measurements. These values were taken from a statistical sampling of the cladding.

i 4055

Mr. Sanard C. Ru:chs Pig 2 2 A

e, 9

4.

The cladding te=peratures were calculated using assembly outlet tempera-tures.

This results in cladding temperatures which are conservatively high when combined with the maximum design peaking factors.

The most limiting assembly was determined to have a collapse time of greater than 29,999 EFPH which exceeds the maximum projected three cycle core life of 24,746 EFPH.

It is currently planned to extend the Oconee 3, Cycle 1 fuel cycle from 456 EFPD to 486 EFPD.- The current Technical Specifications and their bases have been reviewed and it is confir=ed that the current specifications are valid for this extended cycle length.

Pursuant to 10CFR50, 150.90,-it is requested that the restriction limiting Oconee 3 to 10,944 EFPH contained in Specification 3.11 be deleted in order to. facilitate this operation.

Very{rulyyours,

/

A m, a. _ 'sWilliamO. Parker,Jr.g.

MST:mmb 1

m 6

4

,m m

Mr. Benard C. Rucch3 April 16,-1976 Page 3 ^ ^

WILLLei 0. PARKER, JR. being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for

-amendment of the Oconee Nuclear Station Facility Operating Licenses DPR-38,

'DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

ML0 William O. Parker, Jr., 'Vice President ATTEST:

)

l ohn C. Goodman, Jr.

/g Assistant Secretary Subscribed and sworn to before me'this 16th day of April 1976.

t Notary Public My Commission Expires:

l l

l

.