Requests Extension of CPPR-35 Completion Date to 741030
ML19340A142
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/14/1974
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001100607
Download: ML19340A142 (4)


Text

.

%.Y wy

% cy.

Du n n Powen Godriwsy Powe n Durunxo s

c::' south Cn ewcu S t urr.T. Cu antorrt:, N. C. un.*oi A. c. Tin e.,

it o. nox g3;n se.on vn a r.r s.c a=,

PactDuC9%se A=Dlehhges SS'04 May 14, 1974

_. y 7 ( - 41; '

fQ/y' 79

' ll f.s'

, Df-

  • 0, t'

jf., h

.9, as

/

dh i1 ll)

Mr. Angelo Giambusso C,

07',',', q-y Al I.),

b h

Deputy Director for Reactor Projects Directorate of Licensing C

F Office of Regulation Id47 d

T N,'

[C

  • f8 II
i..

N

/

U. S. Atomic Energy Commission

.N N-k',e.

L bu (N

Washington, D. C.

20545 2

f

$blfli Y

DTV fxicr}*g{T W

Re: Oconee Unit 3 hs; g

Docket No. 50-287 fit 4'

Dear Mr. Giambusso:

Duke Power Company hereby applies for an extension of time for completion of Oconee Nuclear Station, Unit 3, under construction pursuant to Pro-visional Construction Permic CPPR-35.

The original construction permit for Unit 3 called for completion of that unit by August 1, 1973.

This date was extended to June 30, 1974 by your order dated July 30, 1973.

As noted in the July 3, 1973 request for extension of the Unit 3 con-struction permit, only normal contingencies were provided for in the schedule which established the May, 1974 fuel loading date.

Listed below are those factors which had direct impact on the Unit 3 schedule and resulted in the indicated effective delays:

Modifications to high energy lines outside containment - two weeks 1.

Inspection and modification of the reactor coolant pumps as a result 2.

of the Unit 2 RCP seal failure - two weeks 3.

Materials Shortages - three weeks Oconee Units 1 and 2 had an indirect impact on the Unit 3 schedule due to a maintenance outage of Unit 1 from December 23,,1973 to January 18, 1974, and an outage of Unit 2 from January 22, 1974 to the present time for repair and modification of the reactor coolant pump seals and retrieval of the loose object in the Unit 2 lower reactor vessel head.

The e?

90 0 il 00 607

x.

(

Mr.'Angelo Giambusso

- Page 2 May 14, 1974 diversion of manpower for these outages delayed the Unit 3 schedule for approximately five weeks.

We now anticipate that Unit 3 will be complete and ready for fuel loading s

24,~1974. This schedule, however, does not include contingencies on. July for failure of vendors to meet-promised delivery dates of components or problems which may arise during the preoperational checkout of systems.

We hereby request that"the latest comp 1'etion date specified in the Con-struction Permit CPPR-35 be extended from June 30, 1974 to October 30, 1974.

As required by Sections 2.101 of the Commission's regulations,.a copy of this request for an extension of time for completion of Oconee Nuclear Station Unit 3 is being served on Mr. Reese A. Hubbard, County Supervisor of Ocone.e County, South Carolina, the county in which the facility is located.

Very truly yours,

)

W '

A. C. Thies ACT:vr s.

/

Mr. Angelo Giambusso Page 3 May 14, 1974-A. C. THIES, being duly sworn, states that he is Senior Vice President of Duke Power Company; that_ he is authorized on the part of said Company to sign and file with the Atomic Energy Commission this application for renewal of Construction Permit CPPR-35; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

A. C. Thics, Senior Vice President l

ATTEST:

w

,e Jo n C. Goodman, Jr. V sistant Secretary d

Subscribed and sworn to before me this 14th day of thy,1974, fb-re x -