Summarizes 720928 Telcon W/Util Re Industrial Security Plan,Addl Financial Info,Control Rod Drive Surveillance Program & Interpretation of Tech Spec 6.1.1.7c
ML19340A129
Person / Time
Site: Oconee 
Issue date: 10/02/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001090780
Download: ML19340A129 (1)


Text

= - -

7

? AM pI:-/f T c%,$_-.

p u%t-

! J k -^ ' ' '

a

,e

^

C f i '.,Q Y;s,1.

v OCT.-13 IS/2

' Note toiFilesT

~

.TELECON WITH CANADY, DUKE'-POWER COMPANY, 9/28/72, GENERAL' ITEMS-In1a Selecon..with Duke :(Canady) the :following information war.

' revealed.

1. (The1 Duke. consultant
  • preparing the industrial security plan is~not going to complete lhis work before October 515, 1972,cthe'date.which Duke had planned on' submitting the Duke.will need'two weeks to review after-
plan'to AEC.

receivingithe consultant's. work.

Hope is dimming for

~

our chances of.having the plan in time to review it' before a'NovembertACRS' meeting.

However, our position remains that the olan must-be in the record prior to

-licensinc Unit-1 although.aporoval and implementation will-notbe a recuirement for licensing Unit-1.

2.t Duke is-still-considering my request for additional

~

financial:information per the telecon request from Ray Carroll,.OC.

Duke has readt the regulation.and feels that itfhas complied.

I suggested that he- (Canady): call-Carroll in.. order'to get specifics about the request before Duke makes up;its' mind what to do.

He said he would do this.

3.

Duke has only assumed 1 that Oconee 2 would be used for the 4500 control rod drive surveillance program.

To Canady's

-knowledge there is no. agreement in writing.between B&W

-and: Duke.; ~ (Our recent letter to B&W on this subject asks 3&W to confirm.this).

4.

1 Ke's interpretation of: Technical-Specification 6.1.1.7c is'that one licensed Reactor' operator will be actually.

-(physically) in the reactor building when fuel ' handling operationsLare-in'progressfand that the Senior Reactor Operator who is in charge of all fuel handling activities

~

will!be Jin the control. room or. other appropriate piaces surveying._overal1Lplant conditions pertinent to safe-fuele. handling - (boron concentrations, cooling. systems,

radiation levels and ext'ernal plant evnironmental conditions, etc.).

\\

\\

'Sh I.A.hditier Lcc:..I.

Peltier..