Forwards Proposed Tech Spec 3.9 Re Measures to Assure Conformance W/Liquid Waste Effluent Release Limits.Forwards Tech Spec Replacemtent Pages
ML19340A110
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/30/1976
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML19340A111 List:
References
NUDOCS 7911250037
Download: ML19340A110 (3)


Text

-

DUKE POWER COMPANY Po,w=. Bt:stonwo 422 SouTn Cucaca Srazzi. CnAntoriz. N. C. as24a

/-

WI LLI Aed O. PAR M ER, J R.

/'

A'."

VtC E P#CSiOtNT

  1. ~

TELE *=0 set: Anta 704 stCa= Peoovet en f

i+~"

373-4003 July 30, 1976 WJ_tp p

Q Mr. Benard C. Rusche

\\

[

MlJG g @ O Director of Nuclear Reactor Regulation

~

U. S. Nuclear Regulatory Commission k.,

g Washington, D. C.

20555 Re: Oconee Nuclear Station

.y f,

Docket Nos. 50-269, -270, -287 Ni !

T

Dear Mr. Rusche:

Pursuant to 10CFR50, 550.90, an amendment to Section 3.9 of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, -47, -55 is requested. Proposed replacement pages for Technical Specification 3.9.7 are attached.

The proposed change to Technical Specification 3.9.7 provides provisions for implementing alternate measures-to assure that release limits for liquid waste effluents are not exceeded whenever liquid waste monitors cannot be set to properly alarm and control liquid releases. This provision is considered necessary while efforts are being made to-resolve problems with high background which have been experienced in the liquid effluent monitors. These high background readings prevent the setting of these monitors to function as required by Technical

. Specification 3.9.7.

The alternate proposed measures as stated in the specification change consist of redundant valve line-up checks and redundant sampling / analyses as discussed in our letter of May 14, 1976 submitted as a supplemental response to OIE Inspection Report 50-269/76-2.

Currently, a task force is investigating the high background problem associated with the liquid ef-fluent monitors.

It is anticipated that this problem will be resolved by December 1 -1976 at which time the' additional proposed requirements of Technical Specification 3.9.7 will be deleted.

In the interim, although no accurate alarm setpoint can be determined, liquid effluent monitors RIA-33 and -34 will be utilized to the extent possib e to detect 1 quid effluent release rates.

\\

Ve, truly yours,

/'

.u.

c.

William.0. Parker, Jr.

q( v o,,o.

t EDB:vr Attachment fcjjip$c Q-f

7

Mr. Benard C. Ruccha

-July 30, 1976 Page 2 WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Ocotiee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of h knowledge.

,^

i M.1 d,

n og William O. Parker, Jr., V g President ATT b-}

ohn C. Goodman, Jr.

~

'(/

sistant Secretary i

Subscribed and sworn to before me this 30th day of July,1976.

4L k wm Notary Public My Cocnission Expires: