Summary of Meeting with Southern Nuclear Operating Company to Discuss Draft Supplement to License Amendment Request (LAR)19-016, and to Conduct Technical Exchange on LAR 19-017 and LAR 19-001
ML19339G918
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/05/2019
From: Jennivine Rankin
NRC/NRR/VPOB
To: Victor Hall
Office of Nuclear Reactor Regulation
Rankin J, NRR/VPO
References
Download: ML19339G918 (10)


Text

December 5, 2019 MEMORANDUM TO: Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: Jennivine Rankin, Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON OCTOBER 24, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on October 24, 2019. The purpose of the meeting was to discuss a draft supplement to License Amendment Request (LAR)19-016, Reinforcement Changes for Wall L and Wall 7.3, and to conduct a technical exchange on LAR 19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test, and LAR 19-001, Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification Revision.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19248C482. The meeting notice is also posted on the NRC website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:

  • Draft Revision to LAR 19-016 and ML19296A014 associated Preliminary Amendment Report (PAR): Reinforcement Changes for Wall L and Wall 7.3
  • Supplement to LAR 19-001: Protection ML19280E414 and Safety Monitoring System Surveillance Requirement Reduction Technical Specification Revision CONTACT: Jennivine Rankin, NRR/VPO (301) 415-1530

V. Hall Summary of Meeting:

Technical Discussion on Draft Revision to LAR 19-016: Reinforcement Changes for Wall L and Wall 7.3 and Associated PAR Staff from the NRC discussed a draft revision to LAR 19-016 with SNC. SNC provided an overview of the draft revision which is being proposed to include additional evaluation because the as-built amount of vertical reinforcement provided does not meet the specified minimum provided reinforcement in the Updated Final Safety Analysis Report for Wall L. The already submitted LAR 19-016 (ADAMS Accession No. ML19234A327), under review by the NRC staff, addresses the horizontal nonconformities. The NRC made a few observations for SNC to consider which are described below:

  • Clarify in the LAR which elements are stressed from the vertical rebar nonconformance.

Confirm whether they are analyzed and outline the determination made.

  • Modify language on page 12 of Enclosure 3 to describe the effect on the stiffness of the seismic model to be negligible. Evaluate making any conforming changes to the planned submitted PAR.
  • Specify the previous shear friction capacity during discussion about the construction joint on page 13 of Enclosure 3.

SNC expected the revised LAR and associated PAR to be submitted by October 25, 2019 and will request a no objection finding for the PAR by November 15, 2019.

At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Technical Discussion on LAR 19-017: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Staff from the NRC discussed LAR 19-017 with SNC. The LAR requests a change to remove the natural circulation test of the PRHR heat exchanger, which is conducted during preoperational testing, from the scope of the initial test program. This LAR had been discussed at two previous public meetings (see ADAMS Accession Nos. ML19270G587 and ML19294A113 for meeting summaries). During the meeting, SNC reiterated the following points:

  • Natural Circulation and Forced Flow when applied to PRHR heat exchanger tests, describe the flow driving mechanism.
  • The technical difference between forced flow testing and natural circulation do not provide additional insights beyond what can be obtained from the test with regards to flow rate or heat transfer performance.
  • The forced flow test approximately measures heat transfer of as-installed PRHR heat exchanger at elevated temperatures, providing design and construction requirements of the PRHR heat exchangers are met.
  • Any potential construction impacts affecting flow rate or PRHR heat exchanger performance will be become apparent during the forced flow test.

The NRC staff agreed that the heat transfer characteristics of the two tests are similar.

However, removal of the preoperational PRHR heat exchanger natural circulation test would Enclosure 2

V. Hall eliminate demonstration of initiating and establishing natural circulation. Therefore, the NRC staff noted a possible solution is to conduct some kind of test during power ascension testing as part of the initial test program to demonstrate natural circulation can be initiated and established to demonstrate that natural circulation flow rate can be fully developed. This could be done in conjunction with an already existing test. SNC representatives also stated it could be possible to analytically justify the mechanisms that initiate and establish natural circulation. NRC staff agreed that such a demonstration might be possible but would likely require more technical detail that has not yet been provided as part of the LAR and thus would entail a commensurately more detailed review. SNC took this as an action to evaluate and will communicate with the NRC staff of any changes to their submitted LAR.

Portions of the meeting were closed to the public due to proprietary discussion technical details.

At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Technical Discussion on Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification Revision Staff from the NRC discussed LAR 19-001 with SNC. The NRC staff had a question regarding language in Enclosure 9, page 21, relating to the Actuation Logic Test. The NRC sought to clarify if there was a frequency change for the reactor trip matrix (RTM) and DO630 from 92 days to 92 days staggered (approximately 1 year) as a result of the elimination of Surveillance Requirement (SR) 3.3.6.1. SNC noted that currently the RTM and DO630 were being tested on a more frequent basis of 92 days because of inclusion in SR 3.3.6.1. However, with the elimination of SR 3.3.6.1, there is justification to support the frequency of approximately 1 year because of the industry operating experience, reliability, and operating history data.

At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Docket Nos.: 52-025 52-026

Enclosure:

As stated cc w/encls: See next page Enclosure 2

ML19339G918 *via e-mail NRC-001 OFFICE PM: VPO LA: VPO PM: VPO BC: VPO NAME JRankin* (c) RButler* CPatel* VHall DATE 10/29/19 10/29/19 11/4/19 11/19/19 OFFICE PM: VPO NAME JRankin (s)

DATE 12/05/19 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, October 24, 2019 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED. (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1 Enclosure 2

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, October 24, 2019 One White Flint North, Room O-8B4 9:00 a.m. - 4:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Victor Hall Chandu Patel Jennivine Rankin NRR/VPO Chris Welch*

Don Habib Cayetano Santos*

Pravin Patel Maryam Khan Dinesh Taneja NRR/DEX Jack Zhao Stewart Bailey Becky Karas Ryan Nolan Hanry Wagage NRR/DSS Craig Harbuck Vic Cusumano Boyce Travis NRR/DANU Representing Industry Mark Humprhey*

Tom Hicks*

Nick Kellenberger*

Kelli Roberts Steve Unikewicz Amy Chamberlain*

Stephanie Agee* Southern Nuclear Operating Company Mark Wilson*

Pareez Golub*

Michael Elmer*

Bob Hirmapour*

Jonathon Hartman*

Steve Merkiel*

Enclosure 2

Name Organization Jen Meneely*

Si Su*

Talor Easterling*

Jim Rindfusz*

Zach Harper Westinghouse Electric Company Catherine Pratt*

Venki Prabhu Warren Odess-Gillett*

Richard Paese*

John Wiesman*

Members of the Public Steve Franzone* Florida Power and Light

  • = participated via teleconference 2

Vogtle Units 3 & 4 Mailing List (Revised 05/08/2019) cc:

Office of the Attorney General Resident Inspector 40 Capitol Square, SW Vogtle Plant Units 3 & 4 Atlanta, GA 30334 8805 River Road Waynesboro, GA 30830 Resident Manager Oglethorpe Power Corporation Mr. Barty Simonton Alvin W. Vogtle Nuclear Plant Team Leader 7821 River Road Environmental Radiation Program Waynesboro, GA 30830 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company, Inc. 4244 International Parkway, Suite 120 Document Control Coordinator Bin N-226-EC Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 George B. Taylor, Jr.

2100 East Exchange Pl Anne F. Appleby Atlanta, GA 30084-5336 Olgethorpe Power Corporation 2100 East Exchange Place Brian H. Whitley Tucker, GA 30084 3535 Colonnade Parkway, Bin N-226-EC 42 Inverness Center Parkway, BIN B237 County Commissioner Birmingham, AL 35243 Office of the County Commissioner Burke County Commission Mr. Michael Yox Waynesboro, GA 30830 Site Regulatory Affairs Director Vogtle Units 3 & 4 Mr. Wayne Guilfoyle 7825 River Road, Bin 63031 Commissioner District 8 Waynesboro, GA 30830 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)

ALPUGH@southernco.com (Amanda Pugh) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List Matthew.Williams@hq.doe.gov (Matthew Williams) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)

RJB@NEI.org (Russell Bell)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3