Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-373/80-43 & NRC 801112 & s
ML19339D150
Person / Time
Site: LaSalle  
Issue date: 01/27/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8102170442
Download: ML19339D150 (1)


See also: IR 05000373/1980043

Text

a

kEICg'

[

o

UNITED STATES

'e

.

!"

%

NUCLEAR REGULATORY COMMISSION

g

E

REGION ll1

2

-

s

799 ROOSEVELT ROAD

o,

8

GLEN ELLYN, ILLINOIS 60137

$y

0g.

%,

o

~o #8c /Sg C

.....

January 27, 1981

-

N. g

Docket No. 50-373

'*EC4

,,

Commonwealth Edison Company

M

ATTN:

Mr. Cordell Reed

N~

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

Thank you for your letter dated January 19, 1981, supplementing your letter

of December 15, 1980, relative to the steps taken to correct the noncom-

pliance identified in our letters of November 12, 1980 and January 9, 1981,

and IE Inspection Report No. 50-373/80-43. With respect to this item of

noncompliance, our position remains unchanged, and we acknowledge receipt

of your report pursuant to 10 CFR 50.55(e).

Your cooperation with us is appreciated.

Sincerely,

s

. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

cc:

J. S. Abel, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

,

l

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Projec..

l

Manager

1

cc w/1tr dtd 1/19/81:

Central Files

Reproduction Unit NRC 20b

L

AE0D

l

Resident Inspector, RIII

PDR

Local PDR

NSIC

I

TIC

Dean Hansell, Office of

Assistant Attorney General

8102170M49-s

,-.

e

-

p

'

C:mm:nwrith Edisin

oni fast NaSonal Plata Chicago. Ittinois

Address Reply to Post O'fice Box 767

Chicago, Illinois 60690

.

January 19, 1981

Mr. James G. Keppler, Dire ctor

Directorate of Inspection and

Enforcement - Region III

U.S. Nuclear Regulatory Commission

799 Roosevelt Road

Glen Ellyn, IL

60137

Subj e ct :

LaSalle County Station Units 1 and 2

Electrical Termination Lug Design

Final Report - 10 CFR 50.55(e)

NRC Docket Nos. 50-373/374

References (1):

J. G. Keppler letter to C. Reed dated

January ', 1981

(2):

J. S. Abel letter to J.

G.

Keppler

(_

dated December 15, 1981

Dear Mr. Keppler:

In order to comply with the directive of your of fice

relative to the reporting of corrected termination lug deficiencies

at LaSalle County, Commonwealth Edison submits this report to

satisfy the procedural requirements of 10 CFR 50.55(e).

Although

I

our position relative the reportaoility of this matter under 10 CFR

i

50.55(e) remains the same as was stated in Reference (2), this

(

transmittal is made to document the fact that a deficiency relative

to termination lugs was identified and the corrective action

implemented to resolve that deficiency has been completed.

As was discussed in Reference (2), the termination lug

deficiency was identified by a site contractor (General Electric) on

a control panel (H13-P603) supplied by that contractor.

The

deficiency involved the use of ring lugs specified for use with #10

or #12 wire for terminations of #14 and #11 wire.

Although the site

record does not indicate whether the ac* cal terminations were

de fi cie nt , i.e. did not provide acceptable termination contacts, it

is clear that corrective action was taken to inspect all the

involved control room panels for similar problems and to replace all

improper lugs.

This inspection and replacement program has been

completed.

The conduct of this remedial work was compatible with

the priority classification assigned based on the original review of

,

the dif ficiency by the site contractor.

I

.

& 81M&304 D

l

-

l

/

.

'

.:

/

Mr. James G. Keppler, Director

,/-_

January 19, 1981

.

S

Page 2

.

This is a final report under 10 CFR 50.55(e) in as much as

the corrective action originally defined as necessary has been

completed.

In the event you have any further questions in this

regard, please direct them to this of fice.

,

Very turly yours,

. S. Abel

Diractor of

Nuciaar Licensing