| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/29/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19339C442 | List: |
| References | |
| NUDOCS 8011180379 | |
| Download: ML19339C441 (2) | |
See also: IR 05000483/1980022
Text
I
.
p rar
- -
o
UNITED STATES
^,
8'
g
NUCLEAR REGULATORY COMMISSION
/
3,
a
REGION 111
g
s
'
o
799 ROOSEVELT ROAD
l
% . . . . . j[
GLEN ELLYN. ILLINOIS 60137
'SEP 2 9 GSO
G
o
16
i,i
vb5
ll
YN
Eij
,_S
J:
,N,
S
$'y c
$
Docket No. 50-483
E
f
$
rv
"5
~
-
Union Electric Company
g
g
g
ATTN:
Mr. John K. Bryan
su
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Messrs. R. B. Landsman and
J. Schapker of this office on August 18-28, 1980, of activities at the
Callaway Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-139
and to the discussion of our findings with Mr. W. H. Weber and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of
your receipt of this notice a written statement or explanation in reply,
including for each item of noncompliance:
(1) corrective action taken and
the results achieved; (2) corrective action to be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
Concerning Item 2 of the enclosed Appendi- A, in addition to responding to
the item of noncompliance clease discuss your progran for establishing
that all different gradations of the subject material meete your commitment
of 95% of modified proctor contained in Section 2.5.4.5.1 of the Callaway
PSAR.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
8022180
_
.
4
.
.
Union Electric Company
-2-
SEP 2 9 G80
Room, exespt as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
i
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
,
)
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
-
application.
.
Sincerely,
.
.dhaa.
G. Fiore111, Chief
4
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
]
No. 50-483/80-22
'
cc w/encls:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
i
Regions I & IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
.
Division, Missouri Public
l
Service Commission
1
l