Forwards IE Insp Rept 50-483/80-22 on 800818-20 & Notice of Violation
ML19339C441
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/29/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19339C442 List:
References
NUDOCS 8011180379
Download: ML19339C441 (2)


See also: IR 05000483/1980022

Text

I

.

p rar

  • -

o

UNITED STATES

^,

8'

g

NUCLEAR REGULATORY COMMISSION

/

3,

a

REGION 111

g

s

'

o

799 ROOSEVELT ROAD

l

% . . . . . j[

GLEN ELLYN. ILLINOIS 60137

'SEP 2 9 GSO

G

o

16

i,i

vb5

ll

YN

Eij

,_S

J:

,N,

S

$'y c

$

Docket No. 50-483

E

f

$

rv

"5

~

-

Union Electric Company

g

g

g

ATTN:

Mr. John K. Bryan

su

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Messrs. R. B. Landsman and

J. Schapker of this office on August 18-28, 1980, of activities at the

Callaway Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-139

and to the discussion of our findings with Mr. W. H. Weber and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice a written statement or explanation in reply,

including for each item of noncompliance:

(1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

Concerning Item 2 of the enclosed Appendi- A, in addition to responding to

the item of noncompliance clease discuss your progran for establishing

that all different gradations of the subject material meete your commitment

of 95% of modified proctor contained in Section 2.5.4.5.1 of the Callaway

PSAR.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

8022180

_

.

4

.

.

Union Electric Company

-2-

SEP 2 9 G80

Room, exespt as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

i

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

,

)

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

-

application.

.

Sincerely,

.

.dhaa.

G. Fiore111, Chief

4

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

]

No. 50-483/80-22

'

cc w/encls:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

i

TIC

Regions I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

.

Division, Missouri Public

l

Service Commission

1

l