i
\\
'
[p3 MGg*o
UNITED STATES
E\\ 4q '4
NUCLEAR REGULATORY COMMISSION
'
c
REGION 111
N
,
~,. f
799 ROOSEVELT ROAD
o,
U
GLEN ELLYN ILLINolS 60137
o
_
OCT
9 1360
]
b
F
- e
,,s
Q
eq
xm
,, i
+4>
NS
63
hh
~T]N
Docket No. 50-456
,,
Docket No. 50-457
K
N3
$
N
Commonwealth Edison Company
g
u
@
ATTN:
Mr. Cordell Reed
sn
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine inspection conducted by Mr. M. P. Phillips
of this office on September 17-19, 23, 1980, of activities at the
Braidwood Station, Units 1 and 2 authorized by NRC Construction Permits
No. CPPR-132 and No. CPPR-133 and to the discussion of our findings
with Mr. C. McDonough and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspectica report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncomplianca with NRC requirements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
twenty days of your receipt of this notice a written statement or
explanation in reply, including for each item of noncompliance:
(1)
corrective action taken and the results achieved; (2) corrective action
to be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
8011T7OVW
W
,
7
. %) -
Commonwealth Edison Company-
-2-
OCT
9 1353
4
r
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office,'within twenty-days of your receipt
of this letter, to withhold such information from public disclosure.
The application must include a full statement of the reasons for which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
<
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/
o
,
'
~
v
'
th1 A. B. Davis, Chief
4
1
Fuel Facility and
F
Materials Safety Branch
,
Enclosures:
1.
Appendix A, Notice'
,
1
l
of Violation
4
2.
IE Inspection Report
No. 50-456/80-09 ind
~ No. 50-457/80-08
l
cc w/ enc 1:
,
Mr. J. S. Abel, Director
of Nuclear Licensing
>
Mr. 'R. Cosaro, Project
Superintendent
Central Files
. Reproduction Uni NRC 20b
Local PDR
!
i
Mr. Dean Hansell, -Office of
j
Assistant Attorney General
i
,
.$+-
.sn
,
y
-
,
.e..
.
,
e.
-