Forwards IE Circular 80-23, Potential Defects in Beloit Power Sys Emergency Generators. No Written Response Required
ML19339C127
Person / Time
Site: Comanche Peak  
Issue date: 10/31/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8011170609
Download: ML19339C127 (1)


Text

-

/. _s G UfelTED STATES g

~

- i NUCLEAR REGULATORY COMMISSICN b

REGION IV k,h..... "f 611 RYAN PLAZA DRIVE. SUITE 1000 ARLINGTON. TEXAS 76011 October 31, 1980

.-j d

Zn Reply Refer To:

n 4

_ " - gj RIV Eij Docket Nos.

50-445/IE Circular No. 80-23 J.=L i N

I,;E) 50-446/IE Circular No 80-23 (Mi l.}Ej y

!3 Mi s

c Si I?

G u,

U1

c Texas Utilities Generating Company V3 ATTN:

Mr. R J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

Enclosed is IE Circular No. 80-23 which requires consideration by you with regard to your nuclear power facilities.

Should you have any questions regarding this circular or the actions recommended therein, please contact this office.

Sincerely,

/

.m J-7

'~B c_[

. _! ' J.

tvi Karl V.'Seyfrit -'

Director

Enclosures:

1.

IE Circular No. 80-23 2.

List of Recently Issued IE Circulars I

8011170 (=>O9

/

SSIrlS fio. : 6830 Accession flo.:

8008220243 IEC 80-23 UtlITIED STATES fiUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTI0tl AND ENFORCEMENT

!!ASHINGT0tl, D. C. 20555 October 31, 1980 IE Circular t!o. 80-23

POTEllTIAL DEFECTS IN BELOIT POWER SYSTEMS EMERGENCY GEt'ERATORS BACKGROUllD This circular addresses a potential deficiency involving the field leads of generators manufactured by Beloit Power Systems.

It is known that the subject generators have been couoled with Fairbanks Morse diesel engines for use in nuclear power facilities; however, it is not known whether they have been coupled with other diesel enoines for such use. Accordingly, the intent of this circular is to notify all nuclear power facilities of the potential 1

defect and to assure that appropriate remedial actions are taken, if needed.

The Nuclear Regulatory Commission was first informed of the potential defect by a phone call from Mr. R. H. Beadle of the Fairbanks Morse Engine Division of Colt Industries to Mr. D. W. Hayes of Region III on September 19, 1980. On September 20, 1980, a conference call was held between the NRC Duty Officer, personnel from Prairie Island Nuclear Power Station, Mr. Beadle of Fairbanks Morse and Mr. C. Evenson of Beloit Power Systems, the principal spokesman.

The purpose of this call was to describe an inspection method which Prairie Island personnel could use to examine the field lead assemblies of their cen-erators for the potential defect.

(i.'e have since been informed by the Resident Inspector that tha field lead assemblies of the Prairie Island generators did not have the susp e ted defects.)

In order to dissemiete this information on a timely basis, the NRC Duty Officer at Bethesda called those operating facilities which he knew were using the suspect generators on September 20 and 21,1980. The information conveyed included a description of the potential defect and a description of the aforementioned inspection method. The operating facilities called were:

FACILITY N0. OF UNITS j

Calvert Cliffs 1 and 2 3

Crystal River 3 2

Hatch 1 and 2 Duane Arnold j

North Anna 1 and 2 DUPLICATE DOCUMENT I

1 Millstone 1 and 2 Robinson 2 Prairie Island Entire document previously entered into system under:

Pea Botto and 3 ANO _ M T hh 0 M 3 Arkansas Nuclear One, Un

.