[(famerg'o,,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION D
E WASHINGTON, D, C. 20665
%,.....[
November 5, 1980 MEMORANDUM FOR: Thomas A. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing FROM:
V. Rooney, Project Manager Oparating Reactors Branch #2 Division of Licensing
SUBJECT:
SUMMARY
OF MEETING HELD ON OCTOBER 31, 1980 TO DISCUSS VERMONT YANKEE CORE SPRAY SPARGER CRACKING On October 31,1980 representatives of Vermont Yankee Nuclear Power Corporation Yankee Atomic Electric Company, and General Electric Company met with the NRC staff. Enclosure A lists attendees.
i The meeting was for the puroose of discussing a crack discovered in the core spray sparger upper "C" junction box on October 14, 1980 during Inspection as required by IE Bulletin 80-13. The crack is circular in shape, about 3 inches long, and appears to have fonned along the heat affected zone of a 3/4 inch diameter plug welded into the face of the junction bux.
The agenda of the meeting is enclosed as Enclosure B.
The iicensee des-l cribed a T-Box Clamp device he planned to install, which would retain the l
plug in the event of further cracking and minimize flow through the crack.
The clamp portion of the device was the same design as had previously been used at Oyster Creek. Discussion of the device included consid2 ration of strength of tack welds used to secure locking caps and plates, possible loose parts considerations, and calculated ECCS performance assuming full through-wall encirclement of the plug by the crack with the clamp devic.e in place.
The staff requested that the licenset:
- 1) Perfonn a visual examination of the clamp device and core spray header each refueling outage that the clamp device remained in use.
- 2) Provide a report describing the considerations presented in the meeting.
In particular this report should address:
4
.v..
._ s l !
Mr. Robert L. Smith Resident. Inspector Licensing Engineer c/o U. S. NRC Vermont Yankee Nuclear Power P. O. Box 176 Corporation Vernon, Vermont 05453 25 Research Drive Westboro, Massachusetts 01581 Mr. W. F. Conway John R. Stanton, Director Vice President and Manager Radiation Control Agency of Operations Hazen Drive Vermont Yankee Nuclear Power Concord, New Hampshire 03301 Corporation P. O. Box 157 John W. Stevens Vernon, Vermont 05602 Conservation Society of Southern Vermont Mr. Louis H. Heider, V.P.
P. O. Box 256 Vermont Vankee Nuclear Power Townshend, Vermont 05353 Cornoration 25 Research Drive Dr. Mars Longley, Director Westboro, Massachusetts 01581 Occuoational & Radiological Health 10 Baldwin Street John A. Ritscher, Esquire Montpelier, Vermont 05602 Ropes & Gray 226 Franklin Street New England Coalition on Nuclear Boston, Massachusetts 02110 Pollution Hill and Dale Farm Laurie Burt West Hill - Faraway Road Assistant Attorney General Putney, Vermont 05346 Environmental Protection Division Attorney General's Office Public Service Board i
One Ashburton Place, 19th Floor State of Vermont
(
Boston, Massachusetts 02108 120 State Street Montpelier, Vermont 05602 i
Ronald J. Wilson 81018th Street, N. W.
W. p. Murnhy, Plant Superintendent Suite 802 Vermont Yankee Nuclear Power 1
Washington, D. C.
20006 Corporation P. O. Box 157 Honorable M. Jerome Diamond Vernon, Vermont 05354 Attorney General State of Vermont David White 109 State Street Co-Director Pavilion Office Building Vermont Public Interest
'M.ontpelier, Vermont 05602 Reserach Groun, Inc.
26 State Street i
Mr. J. E. Griffin, President Montoeiler, Verrent 05602 Vermont Yankee Nuclear Power Corpormtion Vermont Yankee Decommissioning 77 Grove Street Alliance Rutland, Vermont 05701 5 State Street Box 1117 Vermont Yankee Decommissioning Montpelier, Vermint 05602 Alliance 127 Main Street Brooks Memorial Library Brattleboro, Vermont 05301-224 Main Street Brattleboro, Vermont. 05301
Enclosure A LIST OF ATTENDEES Vermont Yankee Nuclear Power Corporation _
W, Murphy Yankee Atomic Electric Company, R. White R. Cunlea R. Wanczyk B. Slifer General Electric Compm _
L. Gifford J. Rawlings NRC L. Phillips K. Herring R. Hermann T. Huang V. Rooney
- ' ~ '
Enclosure B
Subject:
Core Spray Sparger T-Box Indication Place:
Phillips Building - Bethesda, MD Time:
October 31,1980; 10:00 a.m.
Pa rtici pants :
W. P. Murphy
- Plant Superintendent B. C. Slifer
- Manager, BWR Transient Analysis R. E. White
- Engineer - Mechanical Engineering YAEC R. J. Wanczyk - Senior Engineer - Operational Projects R. A. Dunlea
- Senior Systems Engineer AGENDA I.
Introduction A.
Plant Status B.
Startup Schedule II.
Discussion of As-Found Condition A.
Description of Sparger/T-Box Assembly B.
Location of Indication C.
Crack Morphology I;I. T-Box Clamp A.
Description / Function B.
Installation IV.
System Hydraulic Characteristics A.
Capacity B.
Effects on ECCS Analysis V.
Conclusions A.
Corrective Actions l
l f
.s =%q(%,
UNITED STATES 3
NUCLEAR REGULATORY COMMISSION e
a c'
cs j wasmwaTow, p. c. 2oses
\\,*~..../
t1 M
Ej il r
n
- a7 F3 iLA i.' 9.. --
'v? Ji E! ps 22 un e
=sa
'~
5 na "E
R.,,
s.
c3
\\
l l
i z______...._______________________...________.________...__..._________________________________.
Docket File V. Noonan NRC PDR G. Knighton Local PDR D. Ziemann 1
LJDRB !2 Reading P. Check NRR Reading G. Lainas H. Denton D. Crutchfield E. Case F. Pagano D. Eisenhut R. A. Clark R. Purple OELD R. Tedesco OI&E (3)
T. Novak
- 5. Sheppard T. Ippolito Project Manager R. Reid ACRS (16)
A. Schwencer NRC Participants TERA 11 SIC::.w Resident Inspector i.
l
~
-