Responds to 800718 & 0811 Ltrs Re IE Health Physics Rept 50-155/80-04.Off-shift Radiation Protection Coverage Should Be Upgraded to Ensure Effective Accident Response
ML19339B968
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/24/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19339B969 List:
References
NUDOCS 8011100515
Download: ML19339B968 (2)


See also: IR 05000155/1980004

Text

7

/'pa #f cq

g

UNITED STATES

8j

NUCLEJR REGULATORY COMMISSION

$ c ' 3 .,, gf 'n' '# . $

REGION til

o,, k% [

f

799 ROOSEVELT HoAD

\\ .% y /

'

GLEN ELLYN,lLLINOls 60137

'

a ...

00"24 ;390

Docket No. 50-155

Consumers Power Company

ATTN: Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

This refers to your letters dated July 18 and August 11, 1980, and our

letters dated June 13 and August 26, 1980, regarding the Health Physics

Appraisal conducted by this office in March 1980. As stated in our

August 26, 1980 letter, your positions regarding Significant Appraisal

Finding No. 2 and Noncompliance Item No. I were forwarded to our Head-

quarters for resolution. The responses from our Headquarters are sum-

marized below.

Regarding Significant Appraisal Finding No. 2, our Headquarters concurred

with the Appraisal findings but noted the lack of specific regulatory

requirements for dedicated radiation protection personnel on off-shifts.

Our position remains, as stated in our June 13, 1980 letter, that

off-shif t radiation protection coverage should be upgraded to ensure

effective accident response. Note also that NRR is currently evaluating

shif t staffing requirements in conjunction with their review of licensee

emergency plans. No further action is planned by this office at this

time.

Regarding Noncompliance Item No. 1, our Headquarters agreed that the

noncompliance citation was valid. The following rationale was provided:

"The NRC provides information for the purpose of clarifying the

specific meaning and intent of regulatory requirements by numerous

means; some examples are Statements of Consideration, Regulatory

Guides, NUREG documents, Bulletins, Circultes, Branch Technical

Positions, and Generic Letters. These documents do not establish

regulatory requirements, but simply clarify the meaning and intent

of existing requirements or denote acceptable methods of imple-

menting the regulatory requirements. Consumers Power Company

acknowledges receipt of the clarifying information provided in the

letter from Ziemann to Bixel dated March 15, 1977 and did not pro-

pose or receive approval for implementing an alternative means of

complying with the subject technical specification."

801110o

f

O

'

Consumers Power Company

-2-

SI' 2 4 i;'33

Inasmuch as your proposed corrective action for this noncompliance appears

acceptable, no further action is planned by this office at this time.

Your cooperation with us is appreciated.

Sincerely,

hfunha

JamesG.Kephfbr_

Director

cc:

Mr. D. P. Hoffman,

Nuclear Licensing

Administrator

Mr. C. J. Ilartman, Plant

Superintendent

cc w/ltrs dtd 7/18/80 and

8/11/80:

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service Commission

.