ML19339B950

From kanterella
Jump to navigation Jump to search
Forwards LER 80-012/03L-0
Date released: 12/19/2019 Download: ML19339B950


LER 80-012/03L-0:on 801005,logs Showed Decrease in Holdup Tank Pressure During 801002-05.Evaluation Showed Leak on Compression Fitting on Inlet to Valve IPCV-1022C.Caused by Improper Reinstallation of Valve After Cleaning
ML19339B953
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/31/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19339B953 (2)
Forwards LER 80-012/03L-0
ML19339B949
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/31/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19339B949 (1)