Text
MA/'7{+L iMI
-
- =
e
UNITED STATES
j
g
4
'* t
NUCLEAR REGULATORY COMMiss!ON
f '
'f
531 P ARK AVENUE
h
REGION I
-
MING OF PRUS$1 A, PENNSYLV ANI A 19406
, . ,
se :m,
-
-
53
.
.
Docket No. 50-213
Q
G-
@co
w
';
a
_1
-
Connecticut Yankee Atomic Power Company
N
C
'j
-
ATTN: Mr. W. G. Counsil
G
6
@
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Sub, ject:
Inspection No. 50-213/80-14
This refers to the routine inspection conducted by Mr. E. P. Jernigan of this
office on August 6-8,25-27, 1980, at Haddam Neck Plant Haddam, Connecticut,
of activities authorized by NRC License No. DpR-61 and to the discussions of our
findings held by Mr. E. P. Jernigan with Mr. R. Graves and others of your staff
at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must be accompanied by an affidavit executed by the owner. of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Consnission as listed in subparagraph (b) (4) of
Section 2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
100
..
..
Connecticut Yankee Atomic Power Company 2
No reply to this letter is required; however, should you have any questions
.I
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
M
V
w
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-213/80-14
cc w/ encl:
R. ' Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Hirmnelwright, Licensing Safeguards Engineer
!
4