ML19339B852
| ML19339B852 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/17/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19339B853 | List: |
| References | |
| NUDOCS 8011100291 | |
| Download: ML19339B852 (2) | |
See also: IR 05000289/1980007
Text
jIC
n
7
u. q
,-
.._
.
N
UNITED STATES
,0
4
[
- g
NUCLEAR REGULATORY COMMisslON
f.
- e
sai paan avenue
j
REGION 1
,.
g
-
usuc or paussia. nunsvi.vania ises
g
....-
a
,
Docket No. 50-289
SE? i N
$5
. ut
f4d
l'Mg
N
MS
Metropolitan Edison Company
y
$
ATTN: Mr. J. G. Herbein
B
G
--
Vice President, Generation
C
@
P.O. Box 542
Reading, Pennsylvania 19640
Gentlemen:
Subject:
Investigation No. 50-289/80-07
This refers to the investigation conducted by Mr. S. D. Reynolds, Jr. of this
office on March 21, 1980 and July 31, 1980 at General Public utilities, Reading,
Pennsylvania office of activities authorized by NRC License No. DPR-50 and to
the discussions of our findings held by Mr. Reynolds with Mr. F. S. Giacobbe of
your staff at the conclusion of the investigation.
Areas examined during this investigation are described in the Office of Inspection
and Enforcement Investigation Report which is enclosed with this letter. Within
these areas, the investigation consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
investigator.
'41 thin the scope of this investigation, no items of noncompliance were observed.
in accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
.0, Code of Federal Regulations, a copy of this letter and the enclosed investigation
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) belipve to be proprietary, it is
necessary that you make a written application with'in 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
001110n % \\
.
.
._
.
.
.-
.-
Metropolitan Edison Company
2
No reply to this letter is required; however, should you have any questions
concerning this iavestigation, we will be pleased to discuss them with you.
Sincerely,
. m
-
g
V 7.
n
Robert . Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Investigation
Report Number 50-289/80-07
cc w/ encl:
R. C. Arnold, Senior Vice President
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Technical Functions
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
R. W. Conrad
J. B. Lieberman, Esquire
G. F. Trowbridge, Esquire
Ms. Mary V. Soutbard, Chairperson, Citizens for a Safe Environment (Without
Report)
.
1