Forwards IE Insp Rept 50-289/80-25 on 800825-29.No Noncompliance Noted
ML19339B842
Person / Time
Site: Crane 
Issue date: 09/17/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19339B843 List:
References
NUDOCS 8011100269
Download: ML19339B842 (2)


See also: IR 05000289/1980025

Text

_

_.- _ _ -_.

-

  • ,

o

'

j

"

_

c

e

UNITED STATES

. , *

i

NUCLEAR REGULATORY COMMISSION

l

REGION I

88

'g

631 PARK AVENUE

KING OF PRUS$1 A. PENNSYLVANI A 19406

sa m

y

y

...

Docket No. 50-289

gh

h

NW

W

Tp9

D

e : As

Metropolitan Edison Company

g

[

g

ATTN: Mr. R. C. Arnold

a

s

-

Senior Vice President

C

o

SE

"

100 Interpace Parkway

Parsippany, New Jersey 07054

Gentlemen:

Subject: Inspection 50-289/80-25

,

This refers to the routine inspection conducted by Mr. S. Chaudhary of this

office on August 25-29, 1980 at Three Mile Island Nuclear Statiow, (Jnit 1,

Middletown, Pennsylvania of activities authorized by NRC License No. DPR-50

and to the discussions of our findings held by Mr. Chaudhary with Mr. Lee

Hillme and other members of your staff at the conclusion of the inspection.

>

Areas examined during this inspection are described in the Office of Inspection

'

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

8Oluoo%sA

.

.

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

ch%

o

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enc 1.osure: Office of Inspection and Enforcement Inspection

.

'

Report Number 50-289/80-25

cc r/ encl:

J. ti. Herbein, Vice President-Nuclear Operations

,

R. J. Toole, Manager. Unit 1

'

W. E. Potts, Manager, Radiological Controls, Unit 1

J. J. Colitz, Manager, Plant Engineering, Unit 1

L. W. Harding, Supervisor of Licensing

R. F. Wilson, Director - Technical Functions

E. G. Wallace, Licensing Manager

I. R. Finfrock, Jr.

R. W. Conrad

J. B. Liebeman, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment

(WithoutReport)

G. F. Trowbridge, Esquire

.

i

l

l