| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML19339B803 | List: |
| References | |
| NUDOCS 8011100109 | |
| Download: ML19339B802 (2) | |
See also: IR 05000498/1980018
Text
-
- -
-_
--
. - _ . -
__
--_.
- - - .
- -
. . _ -
.
_
f
po nta
c
/
'0,
UNITED STATES
I',_'
j
NUCLEAR REGULATORY COMMISSION
.
%/
C
REGION IV
!
%
, '[ [
611 RY AN PLAZA drive, SUITE 1000
%, *.... f
ARLINGTON. TEXAS 76012
In Reply Refer To:
September 19, 1980
1
RIV
Docket No. 50-498/Rpt. 80-18
50-499/Rpt. 80-18
[
4
'
Houston Lighting and Power Company
Attn: Mr. G. W. Oprea, Executive
i
Vice President
i
Post Office Box 1700
Houston, Texas 77001
-
]
Gentlemen:
j
This refers to the inspection conducted by our Resident Reactor Inspector,
l
Mr. H. S. Phillips, during the period of July 1980, of activities authorized
by NRC Construction Permits No. CPPR-128 and 129 for the South Texas Project,
4
Units 1 and 2, and to the discussion of our findings with Mr. R. A. Frazar
,
]
and other members of your staff during the inspection period.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations,
" Quality Assurance Criteria for Nuclear Pcwer Plants." The items of noncompliance
and references to the pertinent requirements are identified in the enclosed
One new unresolved item is identified in paragraph 7.b(2) of the enclosed report.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
4
!
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
]
Section 2.201 requires you to submit to this office, within 30 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance; and
i
(3)
the date when full compliance will be achieved.
i
j
% 11:10o
gy
. .-
.
.
-
-
-
-
'
.
Houston Lighting and Power
2
September 19, 1980
Company
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application shou.? t
be prepared so that any proprietary infor=ation identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
,
,
,-C:72
g W. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosures :
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-498/80-18
50-499/80-18