Forwards IE Insp Repts 50-445/80-18 & 50-446/80-18 on 800801-31 & Notice of Violation
ML19339B797
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/19/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19339B798 List:
References
NUDOCS 8011100102
Download: ML19339B797 (2)


See also: IR 05000445/1980018

Text

---

yfu

,

e-

.

  1. p *8 "800,h,

t

UNITED STATES

'

NUCLEAR REGULATORY COMMISSION

I i

s

$

,

REGloN IV

4V

7 * r,e.: ..f

'.

o

611 RYAN PLAZA DRIVE, SUITE 1000

,,

f

ARLINGTON, TEXAS 76012

'

L

o,; d , ,/ p

g v*f

.....

September 19, 1980

,

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 80-18

50-446/Rpt. 80-18

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

<

Dallas, Texas

75201

t,

Gentlemen:

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. R. G. Taylor, during August 1980, and by Mr. L. D. Gilbert on August 27,

1980, of activities authorized by NRC Construction Permits No. CPPR-126 and

127 for the Comanche Peak facility, Units No. I and 2, and to the discussion

I

of our findings with Mr. R. G. Tolson and other membel, of your staff at the

.

conclusion of the inspection.

Areas-examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

i

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with paragraph 50.55(e) of 10 CFR 50 of the NRC

Regulations. The item of noncompliance and references to the pertinent require-

ments are identified in the enclosed Notice of Violation.

Corrective actions

.

to prevent recurrence were completed prior to the conclusion of this inspec-

tion;

therefore a reply to the Notice of Violation is not requested.

Two new unresolved items are identified in paragraph 4 of the enclosed report.

,

s

801110 0 /c 2--

h

.

-

-

.

o

.

Texas Utilities' Generating Company

2

September 19, 1980

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

k

/

W.C.Seidij, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-445/80-18

50-445/80-18

cc: w/ enclosures

Texas Utilities Generating Company

ATTN:

Mr. H. C. Schmidt, Project Manager