ML19339B797
| ML19339B797 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/19/1980 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19339B798 | List: |
| References | |
| NUDOCS 8011100102 | |
| Download: ML19339B797 (2) | |
See also: IR 05000445/1980018
Text
---
yfu
,
e-
.
- p *8 "800,h,
t
UNITED STATES
'
NUCLEAR REGULATORY COMMISSION
I i
s
$
,
REGloN IV
7 * r,e.: ..f
'.
o
611 RYAN PLAZA DRIVE, SUITE 1000
,,
f
ARLINGTON, TEXAS 76012
'
L
o,; d , ,/ p
g v*f
.....
September 19, 1980
,
In Reply Refer To:
RIV
Docket No. 50-445/Rpt. 80-18
50-446/Rpt. 80-18
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
<
Dallas, Texas
75201
t,
Gentlemen:
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. R. G. Taylor, during August 1980, and by Mr. L. D. Gilbert on August 27,
1980, of activities authorized by NRC Construction Permits No. CPPR-126 and
127 for the Comanche Peak facility, Units No. I and 2, and to the discussion
I
of our findings with Mr. R. G. Tolson and other membel, of your staff at the
.
conclusion of the inspection.
Areas-examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
i
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with paragraph 50.55(e) of 10 CFR 50 of the NRC
Regulations. The item of noncompliance and references to the pertinent require-
ments are identified in the enclosed Notice of Violation.
Corrective actions
.
to prevent recurrence were completed prior to the conclusion of this inspec-
tion;
therefore a reply to the Notice of Violation is not requested.
Two new unresolved items are identified in paragraph 4 of the enclosed report.
,
s
801110 0 /c 2--
h
.
-
-
.
o
.
Texas Utilities' Generating Company
2
September 19, 1980
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
k
/
W.C.Seidij, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-445/80-18
50-445/80-18
cc: w/ enclosures
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas