s p atom f
UNITED STATES p,.
j' g p,
NUCLEAR REGULATORY COMMISSION
{.
3
.j WASHINGTON, D. C. 20555 OCT 3 01980 ~
APPLICAFTS: Kansas Gas and Electric Company and The Union Electric Co.
FACILITIES: The Callaway Plant and the Wolf Creek Generating Station SUPJECT:
SU WARY OF THE OCTOBER 7-10,1980 CASELOAD FORECAST PANEL MEETINGS.
The Caseload Forecast Panel met with the applicants for the Callaway and Wolf Creek Plants during the week of October 7-10, W80. The following activitics were completed during the week:
(1) Kansas Gas and Electric Company presented the information requested in the NRC letter of August 29,1980 (attached); (2) The Wolf Creek site was visited by the panel:
(3) Union Electric presented the information requested in the NRC letter of August 29, 1980 (attached); (4) The Callaway site was visited by the panel, and; (5) The NRC panel presented their conclusions and forecasted the construction completion dates to the applicants in a combined exit interview.
The panel found the Callaway plant to be 72.5% constructed. The earliest NRC forecasted fuel loid date is February 1983. Major factors which affected the panels decision were the installation status of the small bore piping, the amount of cable installed and the number of cables terminated.
The panel found the Wolf Creek plcnt to be 66.3% constructed.
The earliest NRC forecasted fuel load date is December 1983. Major factors which affected the panels decision were the large and small bore piping status; the amount of electrical equipment installed; and the conduit, cable and terminations status.
The NRC plans to return to the Wolf Creek and Callaway plants late next year to review the progress of construction and to reassess the forecasted fuel load dates.
The attendees for each meeting are attached to this summary.
T.//.
dL R. M. Stark, Project Manager Licensing Branch Mo. 1 Division of Licensing
'80111oo 029 g
s ATTENDANCE SHEET 10/7/80 WOLF CREEK FUEL LCAD FORECAST PANEL Gene Rathbun KG&E BLMeyers (Bechtel)
RCSlovic Bechtel Lyle Koerper KG&E Frank Garver KEPC0 Terry Borgman Daniel PEHitt Daniel JLMiller KCPL Mark Sooby KG8E Lee Sippel KCPL Dana Crawford KCPL Randy Kloefborn KG&E Julia M. Rhoder observer RLStright SNUPPS Michael Keener KCC Ronald Fluegge M0 PSC Gary Hadew Wichitu Eagle-Beacon Earl V. Creel KG&E TDKeenan KG&E N. Hill KG&E Joe Hanman DEPCo Joe Mulolland KEPCo WHLovelace NRC/MPA TEVandel NRC RRI Wolf Creek Richard M. Stark NRC Project Mgr.
Forrest T. Rhodes KG&E Melvin L. Johnson KG&E Glenn L. Koester KG&E Gary L Fouts KG&E Edward L. Johns Coffey Co Energency Prpardnes Coord.
O y.
t
'ATTE'NDANCE SHEET 10/8/80 WOLF CREEK CASE LOAD FORECAST PANEL MEETING.
NAME
. Organization i
~ Gene Rathbun KG&E Mel Johnson KGEE GLFouts KG&E Gleen L. Koester KG&E Mark Sooby KG8E Ronald M. Fluegge M0 PSC-Earl.W. Creel KG&E TDKeenan KG8E i
MLHill KG&E GDBoyer KG8E CP.stes KG8E R.Slovic BECHTEL BLMeyers BECHTEL Forrest Rhodes KG&E RLStright
.SNUPPS JLMiller KCPEL Joe Mulholland KEPCo
~
l Nadine Griffin KEPCo i
Frank Garver KEPCo Allan Mee KEPCo Joe Ha nan KEPCo Terry Borgman DANIEL TEVandel US NRC RII
{
WHLovelact US NRC/MPA RMStark US NRC/ Project Mgr.
k I
4 i
i I
i f
N i
4'
~
.y
..a--
.s.a, 1
xa,a
.u.,
.e
.~
]
ATTENDANCE SHEET 10/9/80 CALLAWAY FUEL LOAD FORECAST PANEL Richard M. Stark NRC Project Mgr i
VHLovelace NRC/MPA WAHansen
'NRC Reactor Inspector TAEsswein UE JWRinke UE j
RJSr.hukai UE Ront.ld M. Fluegge M0 PSC-3 WFReilly SNUPPS Staff Bel Meyers BECHTEL 4
David L. Winter M0 PSC ACPasswater UE GPRathbun
-KG8E RLSTright SNUPPS Staff i
VRStarks Adj. Property owner i
and intvenor HJStarr DIC l
RLPowers Supt. Site QA i
RAMcAleenan UE PLSykora DIC Morgan L. Doyne UE JFMcLaughlin UE MAStiiler UE tlalter H. Weber UE l
James N. Kaelin UE David e. Black UE David R. Hunt UE Donald W. Capone ~
UE.
Donald F. Schnell UE John K. Bryan UE i
i 4
1 1
j 1
i i
1 p
O ATTENDANCE SHEET 10/10/80 CALLAWAY FUEL LOAD FORECAST PANEL RMStark US NRC WLovelace US NRC WHauser US NRC PJSchukai UE Ronald M. Fluegge M0 PSC David G. Winter M0 PSC BLMeyers BECHTEL RLStright SNUPPS ACPasswater UE RL Powers UE QA WLSykora DIC PJStarr DIC MAStiller UE JFMcLaughlin UE DFCole UE RAMcAlecnang UE Morgan L. Doyne UE David B. Blacke UE James N. Kaelin UE John K. Bryan UE Donald F. Schmell UE T. Van Dell US NRC
~.
t i
CALLAVAY AND WOLF CREEK EXIT INTERVIEW OCTOBER 10, 1980-RMStark US NRC:
i WLovelace
.US.NRC WHansen US NRC I
.TVan Dell US NRC DFSchmell UE j
RJSchukai UE DWCapone UE Walter H. Weber UE John K. Bryan UE Jaaes N. Kaelin UE CRHunt UE l
DND L. Winter M0 PSC Morgan I. Doyne UE 4
Daniel F. Cole UE
'RAMcAleenan UE
(-
GLFouts
'KG8E JLSippel KCPL JLMiller KCPL
-LRSmith Daniel VJFcLaughlin UE WLSykora DIC HJStarr DIC
'RLPowers UE ACPasswater UE Gene Rathbun KG&E RLStright SNUPPS BLMeyers Bechtel MLJohnson KG&E FTRhodes KG8E Glenn L Koester KG8E Gary L. Haden Wichita Eagle-Beacon RMFluegge M0 PSC -
I r
J l
i 1
1 N'
~
j.
1 Mr. Glenn L. Koester Vice President - Operations Kansas Gas ar.d Electric Company 201 North Market Street i
P. O. Box 208 j
Wichita, Kansas 67201 cc: Mr. Nicholas A. Petrick
' Ralph Foster, Esq.
Executive Director, SNUPPS Kansas Gas & Electric Company
(
Mr. Jay Silberg, Esquire William H. Ward, Esq.
Shaw, Pittman, Potts & Trowbridge MACEA i
1800 M Street, N. W.
5130 Mission Road Washington, D..C.
20036 Shawnee. Mission, Kansas 66205 i
Mr. Donald T. McPhee Ms. Treva Hearne,. Assistant General Counsel 4
Vice Presidnet - Production Public Service Commission Kansas City Power and Light' Company P. O. Box 360 1330 Baltimore Avenue Jefferson City, Missouri P. O. Box 679 Kansas City, Missouri 64101 Mr. Tom Vandel Resident Inspector / Wolf Creek NPS James T. Wiglesworth, Esq.
c/o USNRC 9800 Metcalf P. O. Box 1407 Suite 400 Emporia, Kansas 66801 General Tauare Center Overland Park, Kansas 66212 s
Mr. William H. Griffin, Esq.
Assistant Attorney General State of Kansas State House j
Topeka, Kansas 66612 i
Mr. John M. Wylie II Energy Reporter 3
Kansas City Star 4
1729 Grand i
Kansas City, Missouri 64108 Mr. Gary Haden Wichita Eagle and Beacon
. Box A-20 Wichita, Kansas 67201 s
q.
1 e
i
o iir. J. K. Bryan Vice President - Nu~ lear c
Union Electric Company P. O. Box 149 a
St. Louis, Missouri 63166 cc: Mr. Nicholas A. Petrick Mr. William Hansen Executive Director - SNUPPS Resident Insoector/Callattay NPS 5 Choke Cherry Road c/o USNRC Rockville, Maryland 20850 Steedman, Missouri 65077 Gerald Charnoff, Esq.
Shaw, Pittman, Potts &
Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Mr. J. E. Birk Assistant to the General Counsel Union Electric Company P. O. Box 149
~
St. Louis, Missouri 63166 Dr. Vern Starks Route 1, Box 863 Ketchikan, Alaska 99901 Ms. TrevaHearn, Assistant General Counsel Missouri Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Mr. D. F. Schnell Manager-Nuclear Engineering Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 1
O MEETIliG
SUMMARY
_DISlplBUTIOq 580 Docket File G. Lear
')
NRR Reading Z. Rosztoczy Q
I,.
LBul Reading W. Haass u
H. Denton D. Muller
- 2?]
!,jyj E. Case R. Ballard f~;~ch
' s-i D. Eisenhut W. Regan Ihl' '
E
'[50 R. Purple D. Ross e
B. J. Youngblood P. Check A
T 3
A. Schwencer R. Satterf ielti F. Miraglia
- 0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger J. P. Knight R. Houston R. 30snak T. Murphy F. Schauer L. Rubenstein R. E. Jackson RMStark T. Speis Project Manager W. Johnston Attorney, OELD J. Stolz M. Rushbrook S. Hanauer OIE (3)
W. Gammili ACRS (16)
R. Tedesco F. Schroeder D. Skovholt M. Ernst NRC Particioants:
R. Baer C. Berlinger K. Kniel G. Knighton A. Thadani D. Tondi J. Krarmr D Vassalio P. Collins D. Zien: ann bcc: Applicant & Service List e-