Interim Deficiency Rept Re Mfg Defect in Delaval Standby Diesel Generators,Models DSRV12,DSRV16 & DSRV20 Built Before 800201 (Ref Delaval 800919 Part 21 Rept).Possibly Caused by Defective Link Rod.Final Rept Will Be Submitted by 801201
ML19339B662
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/03/1980
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-80-285-000 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011070406
Download: ML19339B662 (2)


Text

. ,- -

50 @

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O Box 5000 m CLEVELANo. OHIO 44101 e TELEPNcNE (216) 622-9800 m ILLUMIN ATING _ BLDG. e 55 PUBLIC SoVAAE Semng The Best Location in the Nation D:lwyn R. Davidson "

viCE PAES!OENT *' ',

c-SYSTEM ENGINEERfMG AND CONSTRUCTION November 3,1980 ' " CE3 Mr. James G. Keppler Director. Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn. IL 60137 Re: Perry Nuclear Power Plant Interim Report DeLaval Standby

Dear Mr. Keppler:

Diesel Generator Model DSRV16 This letter will serve as the interim report as required by 10CFR50.55(e) on the potential significant deficiencies concerning DeLaval Standby Diesel Generators. Model DSRV16. The defect in manufacturing is limited to the Models DSRV12. DSRV16 and DSRV20 built before February 1980. DeLaval notified the NRC of this reportable deficiencies per 10CFR, Part 21 on September 19, 1980. These items were discussed during a telephone conversation between Murray Edelman of The Cleveland Electric Illuminating Company and Mr. Jim Konklin of the Nuclear Regulatory Commission. Region III, Of fice of Inspection and Enforcement on October 8,1980.

Description of Deficiency The Model DSRV16 Standby Diesel Generators were manuf actured by Transamerica DeLaval. Incorporated. DeLaval is supplying four (4) diesel generator units that will be used as standby power source for the Perry Nuclear Power Plant (PNPP). The reportable condition was identified in a letter from DeLaval to The Cleveland Electric Illuminating Company dated September 22, 1980. The potential defect concerns a dowel counterbore in the link rod manuf actured by Transamerica DeLaval that may be too shallow. A defective link rod could lead to

- link rod bolt failure if uncorrected and could result in engine /f non-availability ,

b Currently, the diesei generators are placed in their respective generator bays. Inspection of the diesel generators will take place jh during the Pre-Engine Start Test which is tentatively scheduled for October 1981. At that time. DeLaval will determine whether or not Perry Nuclear Power Plant has this significant deficiency. Any link )

l rod which has the counterbore too shallow will be replaced. DeLaval l

l 8011070IN y

$r. Jemen G. K:pp10r November 3, 1980 proposes that for any link rod that is replaced, the bolts will also be replaced. A final report will be written to inform you of the results of the inspection by December 1,1981.

Very truly yours, ,

/

O f' Dalwyn W. Davidson

/,'

Vice President System Engineering and Construction DRD:jg T13/P/2 cc: Jack Hughes Director of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555

.