ML19339B605
| ML19339B605 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 10/24/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Pasternak R POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| References | |
| NUDOCS 8011070317 | |
| Download: ML19339B605 (1) | |
Text
...,
o.
UNITED STATES
[
!]
M, NUCL':AR REGULATORY COMMISSION
,(
- t e
REGION I 0,
[
631 PARK AVENUE I
%, ' V
.c KING oF PRUSSIA, PENNSYLVANIA 13406 October 24, 1980 Occket No. 50-333 Power Authority of the State of New York
~
James A. FitzPatrick Nuclear Power Pla.it ATTN:
Mr. R. J. Pasternak Resident Manager P. O. Box 41 Lycoming, New York 13093 Gentlemen:
The enclosed Supplement No. 3 to IE Bulletin 79-018, " Environmental Qualifica-tion of Class 1E Equipment," is fonvarded to you for action. This supplement clarifies two issues raised by Supplement No. 2.
These are (1) the submittal of qualification information for equipment resulting from TMI Action Plan requirements and (2) the qualification of equipment which is required to achieve a cold shutdown condition.
This action is a result of industry feedback to NRC regarding interpretation of Supplement No. 2.
The information presented is applicable to your submittal regarding environmental qualification of Class 1E equipneent which is required by November 1,1980.
If you desire additional information regarding this matter, please contact this office.
Sincerely,
/
Ce B yce H. Grier Director
Enclosures:
1.
Supplement No. 3 to IF Bulletin No.79-013 2.
List of Recently Issued IE Bulletins CONTACT:
S. D. Ebneter (215-337-5283) cc w/encis:
George T. Berry, President and Chief Operating 07ficer J. P. Bayne, Senior Vice President.-Nuclear Generation A. Klausmann, Director, Quality Assurance M. C. Cosgrove, Site Quality Assurance Engineer J. F. Davis, Chairman, Safety Review Committee C. M. Pratt, Assistant General Counsel G. M. Wilverding, Manager-Nucleai-Licensing 1
8 0110 7 'J 3lY Q
SSINS No.
5820 Acccssion N2.:
8008220248
)
IES Sup #3 to 79-01E UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT D
7 WASHINGTON, D.C.
20555 3o
,, J October 24, 1980 IE Bulletin No.79-01B Supplement No. 3:
ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Description of Circumstances:
Two issues were raised by Supplement No. 2 which require clarification.
These are:
(1) the dates required for submittal of qualification information for TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally qualified if the licensing basis fo* the plant was a Hot Safe Shutdown condition.
(1) Supplement No. 2 (Q.1, Q.5) addressed the minimum cold shutdown require-ments.
The staff position on this issue is that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achieving and maintaining a cold shutdown condition.
The equipment of other paths must be reviewed to assure that its failure will not aggravate or contribute to the accident (ref.
Q.5 Supp. No. 2).
Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear.
Therefore, the following will apply:
a.
The qualification information for equipment needed to achieve and maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.
b.
The qualification information for equipment required to achieve and maintain a Cold Shutdown condition (ref. Q.1 and Q.5 of Supplement No. 2) must be submitted not later than February 1,1981.
(2) IEB '9-01B required a 90 day response which was due in mid-April 1980.
Sup lement 1 (Feb. 1980) informed licensees that equipment which was "pianned" to be installed as a result of lessons learned need not be addressed in that response.
Some of tnis equipment has since been installed.
Supolement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal.
This position represents no change in staff position regarding the scope of the review.
However, since the staff position on this issue was unclear the following will apply:
a.
Qualification information for inda11ed TMI Action Plan equipment must be submitted by February 1, 1981.
b.
Qua':!fication :nformation for future TMI Action Plan equipment (ref.
NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.
- * ~ * -
IES79-018 Sup #3 Octob;r 24, 1980 Page 2 of 2 c.
Qualification information for TMI Action Plan equipment currently under NRC review should be submitted as soon as possible.
d.
Qualification information for TMI Action Plan equipment not yet installed which does not rec,uire pre-implementation review should be submitted to NRC for review by the implementation date.
The above items 1 and 2 represent no charge in staff position regarding the scope of the 79-OlB Supplement 2 review.
IE Bulletin No. 79-018 was issued under a blanket GAO clearance (8180225 (R0072), clearance expired July 31, 1980) specifically for identified generic problems.
Supplement No. 3 to Bulletin 79-018 is for information, hence no GAO clearance is required.
4 w
J
~
.,- o IE Bulletin No.79-01B Supp'iement No. 2 October 24, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
Supplement 3 Environmental cualifica-9/30/80 All holders of a to 79-01B tion of Class IE power reactor Equipment OL or CP 80-22 1 tion Industries, 9/12/80 All holders of a Model 200-520-008 radiography license 90-21
-(Not Used)
Revision 1 Boron Loss from 8/29/80 All holders to 79-26 BWR Control Blades of a BWR pcwer reactor OL Revision 1 Failures of Mercury-8/15/80 All holders of a to 80-19 Wetted Matrix Relays in power reactor Reactor Protective OL or CP Systems of Operating Nuclear Power Plants Designed by Ce?bustion Engineering 80-20 Failures of Westinghouse 7/31/80 All holders of a Type N-2 Spring Return to power reactor OL Neutral Control Switches or CP 80-19 Failures of Mercury-7/31/80 All holders of a Wetted Matrix Relays in power reactor OL Reactor Protective Systems or CP of Operating Nuclear Power Plants Designed by Combustion Engineering 80-18 Maintenance of Adequate 7/24/80 All holders of a Minimum Flow Thru PWR pcwer reactor Centrifugal Charging Pumps OL or CP Following Secondary Side High Energy Line Rupture Supplement 3 Failure of Control Rods 8/22/80 All holders of a to 80-17 to Insert During a BWR power reactor-Scram at a BWR OL or CP j
l Supplement 2 Failure of Cont.rui Rods 7/22/80 All holders of a to 80-17 to Insert Juring a Scram BWR power reactor OL at a BIF l
I I