s Pr. G UNITED STATES 8"
i NUCLEAR REGULATORY COMMISSION
,E REGION 111 b[
o, 799 ROOSEVELT ROAD o
GLEN ELLYN, ILLINOIS 60137 OCT 2 4 W Docket No. 50-440 Docket No. 50-441 The' Cleveland Electric Illuminating Conapany ATTd: !!r. Dalwyn R. Davidson Vice President - Engineering P. O. Box 5000 Cleveland, OII 44101 Gentlemen:
The enclosed IE Supplement No. 3 to Bulletin No.79-01B is forwarded to you for information.
It clarifies two issues raised by Supplement No. 2.
These are (1) the submittal of qualification information for equipment resulting from TMI Action Plan requirements and (?) the qualification of equipment which is required to achieve a ec1d c:iutdown condition. This action is a result of industry feedback to NRC regarding interpretation of Supplement No. 2.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, naah mz w
/ James G.
'epplet Director
Enclosure:
IE Supplement No. 3 to Bulletin No.79-01B cc w/ enc 1:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen Evans, State i
of Ohio l
l
.8011070 20
)
SSINS No.:
6820 Accession No.:
8008220248 IEB Sup #3 to 79-018 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 24, 1980 IE Bulletin NoJ.79-01B Supplement No. 3:
ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Description of Circumstances:
Two issues were raised by Supplement No. 2 which require clarification.
These are:
(1) the dates required for submittal of qualification information for TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally qualified if the licensing basis for the plant was a Hot Safe Shutdown condition.
(1) Supplement No. 2 (Q.1, Q.5) addressed the minimum cold shutdown require-ments.
The staff position on this issue is, that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achieving and maintaining a cold shutdown condition.
The equipment of other p,ths must be reviewed to assure that its failure will not aggravate or contribute to the accident (ref. Q.5 Supp. No. 2).
Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear.
Therefore, the following will apply:
a.
The qualification information for equipment needed to achieve and maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.
b.
The qualification information for equipment required to achieve and maintain a Cold Shutdown condition (ref. Q.1 and Q.5 of Supplement No. 2) must be submitted not later than February 1, 1981.
(2) IEB 79-01B required a 90 day response which was due in mid-April 1980.
Supplement 1 (Feb. 1980) informed licensees that equipment which was
" planned" to be installed as a result of lessons learned need not be addressed in that response.
Some of this equipment has since been installed.
Sepplement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in +.he November 1, 1980 submittal.
This position represent:, ro change in staff position regarding the scope of the review.
However, since the staff position on this issue was unclear the following will apply:
a.
Qualification information for installed TMI Action Plan equipment must be submitted by February 1, 1981.
b.
Qualification information for future TMI Action Plan equipment (ref.
NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.
~
IEB 79-01B Sup #3 October 24, 1980 Page 2 of-2 c.
Qualification information for TMI Action Plan equipment currently under NRC. review should be submitted as soon as possible.
d.
Qualification information for TMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review by the implementation date.
The above items.1 and 2 represent no change in staff position regarding the scope of the 79-01B Supplement 2 review.
IE Bulletin No.79-01B was issued under 6 blanket GA0 clearance (B180225 (R0072), clearance expired July 31,1980) specifically for identified generic problems.
Supplement No. 3 to Bulletin 79-01B is.for information, hence no GA0 clearance is required.
i I
i
IEB 79-01 Sup #3 October 24, 1980 RECENTLY ISSUED IE BULLETINS Bulletin
. No.
Subject Date Issued Issued To 1
Supplement 2 Environmental Qualification 9/30/80 All power reactor to 79-01B f Class 1E Equipment facilities with an OL 80-22 Automation Industries, 9/11/80 All radiography Model 200-520-008 Sealed-licensees source Connectors 79-26 Boron Loss from BWR 8/29/80 All BWR power Revision 1 Control Blades facilities with an OL 80-20 Failures of Westinghouse 7/31/80 To each nuclear Type W-2 Spring Return power facility in to Neutral Control Switches your region having 4
an OL or a CP 80-19 Failures of Mercury-7/31/80 All nuclear power Wetted Matrix Relays in facilities having Reactor Protective Systems either an OL or a CP of Operating Nuclear Power Plants Designed by Combus-tion Engineering 80-18 Maintenance of Adequate 7/24/80 All PWR power reactor i
Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture Supplement 2 Failures Revealed by 7/22/80 All BWR power reactor to 80-17 Testing Subsequent to facilities holding OLs Failure of Control Rods to Insert During a Scram at a BWR Supplement 1 Failure of Control Rods 7/18/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding OLs at a BWR 80-17 Failure of Control Rods 7/3/80 All BWR power reactor to Insert During a Scram facilities holding OLs at a BWR 80-16 Potential Misapplica-'on of 6/27/80 All Power Reactor Rosemount Inc., Mo k, 1151 Facilities with an and 1152 Pressure Transmitters OL or a CP with Either "A" or "D" Output Codes
_