ML19339B554
| ML19339B554 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 12/23/1977 |
| From: | Collins P Office of Nuclear Reactor Regulation |
| To: | Moody D YANKEE ATOMIC ELECTRIC CO. |
| References | |
| NUDOCS 8011070224 | |
| Download: ML19339B554 (2) | |
Text
/,
N, DISTRIBUTION:
OLB Reading File DEC23 517 OLB Facility File (W/ incoming)
P.F. Collins J.J. Holman A. Burger J ocket files Docket No. 50-29 o al PDR Yankee Atomic Electric Company IE(3)
OELD ATTNr Mr. D. E. Moody
-Manager of Operations j
20 Turnpike Road Westborough, Massachusetts 01581 Gentlemen:
We have reviewed Revision 3 to Procedure AP-500, Yankee Rowe Opera-tor 1 raining Program, submitted on October 17, 1977. Revision 3 incorporates changes designed to maintain a comon approach in meeting the required operator training objectives at all facilities for which Yankee has operational responsibility. Based on our re-view of the submittal, we conclude that the additional infonnation identified in Attachment A is required before we can act on your proposal.
The items are numbered to correspond to the appropriate sections of your submittal.
In order that we may expedite our review, please submit the requested information within thirty (30) days of the date of this letter.
Sincerely.
/ / J. J. Holman for Paul F. Collins, Chief Operator Licensing Branch Division of Project Managenent
Enclosure:
Attachment A - Request for Additional,Information cc Mr. Donald G. Allen, President Yankee Atomic Electric Company -
Westborough, Massachusetts 01581 Greenfield Public Library A'3 402 Main Street Greenfield, Massachusetts 01581~
OLB:DPMd>0 ORB 1:00R o,,,..,
yptMahan:Jg.
7 A. Burger
.u...+
p 7f
-1gjgy7,,
~
-.h. *
.c _
,,,<,.m - m oso
...e
.y 8011070 M4 4-J1
t ATTACHMENT A REQUEST FOR ADDITIONAL INFORMATION 1
YANKEE ATOMIC ELECTRIC COMPANY DOCKET N0. 50-29 II.A.4 The comments and evaluations contained on the completed Operator Evaluation Forms (AP-0500, 7) plus the results of the annual Eval-uction Examination shall form the basis for an accelerated requal-ification program when needed.
J II.C.1 4
l Facility design changes, procedure changes, and facility license changes must be explicitly indicated as a part of the required i
review.
1 II.C.2 1
As a minimum, all abnormal and emergency procedures shall be re-viewed on an annual basis.
II.C.4 Provide the method by which non-shift licensed personnel and Shift Supervisors are evaluated during actual or simulated abnormal and emergency plant conditions.
II.D.1 Appendix A of AP-0500 contains a listing of reactivity changes for which Yankee Rowe will take credit.
The staff position is that only the following constitute acceptable reactivity changes.
t 1.
Reactor startup to the point of adding heat.
2.
Controlled reactor shutdown.
3.
Manual control of steam generator levels during startups and shutdowns when power is less than 15%.
4.
Operation of the turbine governor controls in manual during startups and for power changes equal to or greater than 10%.
5.
Boration or dilution which changes baron concentration by at
-least 10 ppm.
6.
Operation of the manipulator crane in the core during refuel-
.ing.
7.
Any power changes of 10% or more'in manual rod centrol.
8.
Manual rod control prior to and during generator synchronization.