ML19339B500
| ML19339B500 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/30/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| NUDOCS 8011070062 | |
| Download: ML19339B500 (1) | |
Text
- 7 [G p3 Keog UNITED STATES
,[*
Io,,
NUCLEAR REGULATORY COMMISSION '
REGloN IV
=,D S
611 RYAN PLAZA DRIVE, SUITE 1000 7
i
.5g
-l ARLINGTON, TEXAS 76012 g;,.a(/
~ September 30, 1980 In Reply Refer To:
RIV Docket Nos. 50-445/IE Supplement No. 2 to Bulletin 79-01B 446/IE Supplement No. 2'to Bulletin 79-01B Texas Utilities Generating Company ATTN:
Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
The enclosed IE Supplement No. 2 to Bulletin 79-01B is forwarded to you
~
for information. No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, L
Karl V.(Seyfrit
,g Director
Enclosures:
1.
IE Supplement No. 2 to
' Bulletin No.79-01B 2.
List of Recently Issued IE Bulletins i
l I
80110700@-
l
^
M D TN@
9 O ldi kn hp i
,y; SSINS:
6520-
. Accession No.:
8008220241 IEB 79-01B, Suppl. 2' UNITED STATES-NUCLEAR-REGULATORY ~ COMMISSION'
. OFFICE OF INSPECTION.AND ENFORCEMUT WASHINGTON, D.C.
20555 l
~
~IE Bulletin No.79-01B j
Supplement No. 2 Date:
September 30, 1980' ENVIRONMENTAL QUALIFICATION OF. CLASS IE EQUIPMENT i:
Enclosed are-the generic questions and answers which resulted from NRC/ Licensee
[
meetings in NRC-Regional Offices duringLthe week of July 14, 1980 regarding environmental qualification-of Class IE equipment in use at power reactor
- facilities. These answers address specific questions ~ asked during the meetings.
.Due to the generic nature'of some of these questions,'the staff is issuing them as a bulletin supplement'. The regional meetings highlighted the fact.
l that in1some cases, the scope and depth of the 79-01B review was.not clear to
' licensees. Therefore, these answers may affect your 79-01B submittal.
These submittals are required by a separate order to be completed by November 1, 1980.
l
- Some answers given-in Supplement No. I to IEB-79-01B are: superseded by these answers. For example, :in Bulletin Supplement No. 1, issued on February 29~,
I 1980, the-answer to question No. 5 specified.that TMI= lessons learned equipment j
was not included in the review. Howeveri'due to'the extension of the response date from April 14, 1980 to November 1; 1980, this equipment is now being-addressed since its-installation is either complete or required before the issuance of the' February 1, 1981 SER.
(See Question No. 21 of this Supplement.)
No specific response is' requested by this Supplement; however, all answers contained in the enclosure to this Supplement should be carefully reviewed and considered for applicability in.your response to IEB 79-01B.
IE Bulletin-No.-79-01B was issued under a blanket GAO clearance (B180225 (R0072); clearance expfred July 31, 1980) specifically for identifie'd generic -
gf problems. Supplement No. 2-to. Bulletin 79-01B.is for information, hence no GAO clearance ~'is required.
t
Enclosures:
. 1.
Generic Questions and Answers to IEB79-01B and' Memorandum and Order'(CLI-80-21).dat'ed
-May'23 --1980 f