UNITED STATES NUCLEAR REGULATORY COMMISSION g'
g p
REGION I M1 PARK AVENUE Q
,d,g KING OF PRUSSIA, PENNSYLVANIA 19406 September 30, 1980 l
Docket No. 50-333 Power Authority of the State of New York James A. FitzPatrick Nuclear Power Plant ATTN:
Mr. R. J. Pasternak Resident Manager P. O. Box 41 Lycoming, New York 13093 Gentlemen:
The enclosed Supplement No. 2 to IE Bulletin No. 79-018, "Enviror. mental Qualification of Class 15 Equipment," is enclosed.
This information is presented in the form of generic questions and answers which will assist you in responding to the actions required in IES79-01B and the Memorandum and Order (CLI-80-21) dated May 23, 1980 with regard to environmental qualification of Class 1E equipment in use at your facility.
If you desire additional information regarding this matter, please contact this office.
Sincerely, C2 o e H. Grier Director
Enclosures:
1.
Supplement No. 2 to IE Bulletin No. 79-018 2.
List of Recently Issued IE Bulletins CONTACT:
S. D. Ebneter (215-337-5283) cc w/encls:
George T. Berry, President and Chief Operating Officer J. P. Bayne, Senior Vice President-Nuclear Generation A. Klausmann, Director, Quality Assurance M. C. Cosgrove, Site Quality Assurance Engineer J.~ F. Davis, Chairman, Safety Review Committee C. M. Pratt, Assistant General Counsel G. M. Wilverding, Manager-Nuclear Licensing 8 0110700N p
SSINS: 6820 Accession No.:100?J.202f/
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 30, 1980 IE Supplement No. 2 to Bulletin 79-018: ENVIRONMENTAL QUALIFICATION OF CLASS 1E EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC/ Licensee meetir.95 in NRC Regional Offices during the week of July 14, 1980 regarding enviranmental qualification of Class 1E equipment in use at power reactor facilities.
These answers address specific questions asked during the meetings.
Due co the generic nature of some of these questions, the staff is' issuing them as a bulletin supplement.
The regional meetings highlighted the fact that in some cases, the scope and depth of the 79-018 review was not clear to licensees.
Therefore, these answers may affect your 79-018 submittal.
These submittals are required by a separate order to be completed by November 1, 1980.
Some answers given in Supplement No. 1 to IEB-79-01B are superseded by these answers.
For example, in Bulletin Supplement No. 1, issued on February 29, 1980, the answer to question No. 5 specified that TMI lessons learned equipment was not includ-d in the review.
However, due to the extension of the response date from April 14, 1980 to November 1, 1980, this equipment is now being addressed since its installation is either complete or required before the
)
issuance of the February 1, 1981 SER.
(See Question No. 21 of this Supplement.)
No specific response is requested by this Supplement; however, all answers contained in the enclosure to this Supplement should be carefully reviewed and considered for applicability in your response to IES79-018.
IE Bulletin No.79-01B was issued under a blanket GAO clearance (B180225 (R0072); clearance expired July 31, 1980) specifically for identified generic problems.
Supplement No. 2 to Bulletin 79-018 is for information, hence no GAO clearance is required.
Attachnent:
1.
Generic Questions and Answers to IEB-79-01B and Memorandum and Order (CLI-80-21) dated May 23, 1980 DUPLICATE DOCUMENT Entire document previously entered into system under:
N b
ANO No. of pages: