O YANKEE ATOMIC NUCLEAR POWER STATION MONTilLY STATISTICAL REPORT 78-8 FOR THE MONTil 0F AUGUST,1978 8011070 @
1
p
~
OPERATING DATA REPORT DOCKET NO.
F.0-29 DATE 780911 COMPLETED BY R.M. Sictren TELEPHONE (617T366-9011 X228 OPERATING STATUS YANKEE R0h'E Notes
- 1. Unit Name:
- 2. Reporting Period:
August, 1978
- 3. Licensed Thermal Power (MWt):
600 185
- 4. Nameplate Rating (Gross MWe):
175
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependable Capacity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To Which Restricted,1f Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
( -
This Month Yr. to.Date Cumulative 744 5.831
- 11. liours in Reporting Period 739.6 5,668.19 129,661.97
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 736.98 5.648.98 125.433.I1
- 15. Unit Reserve Shutdan Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 432.125.6 3.349.161.3 66.764.800.21
- 17. Gross Electrical Energy Generated (MWH) 130.967.7 1.027.558.2 20.517.904.9
- 18. Net Electrical Energy Generated (MWH) 122,965.17 965,846.80 19,206.348.7 99.1 96.9 79.4
- 19. Unit Service Factor 100.0 100.0
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 94.4 94.7 72.9
- 22. Unit Capacity Feetor (Using DER Net) 94.4 94.7 72.9
.94 2.9 1.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eachi:
Refueling October 20, 1978 for 6.wceks.
- 25. If Shut Down 2* End Of Report Period. Estimated Date of Startup:
- 26. Units In Ter 2s (Prior to Commercial Operation):
Foreast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
AVERAGE DAILY UNIT POWE....EVEL DOCKET NO.
50-29 UNIT
'sANKEE RONE DATE 780911 COMPLETED BY R.M. Sjogren TELEPHONE (617)366-9011 X223 MONTH Aucust 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
I 16R 7 37 169.9 2
168.5 gg 170.1 169.9 3
168.4 39 4
60.9 169.4 20 152.4 168.9 5
21 168.8 169.0 6
22 7
169.3 168.6 23 8
170.4 168.7 24 9
170.5 25 168.5 10 170.6 26 168.I 11 170 7 27 -
167.7 168.6 170.6 28 170.1 169.1 13 29 169.7 169.0 g4 30 169.5 169.0 15 3,
16 INSTRUCTIONS On this forrnst. list the aserage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771 l
f
/
(.
DOCKET NO.
50-29 UNil'SilU1 DOWNS AND POWER REDUCTIONS UNIT NAME Y M FE R N F DATE 7309II COMPLETED ltY R 31-Siceren REPORT MON 11!
Aucust 1978 TELErilONE f617) 366-9011 X2281 3
c
=, _.
c.
Licensee 5't
$*3 Cause & Corrective 3.$
3gy N..
Date E.
Event 5.3 S
Action to 3
0 5gx
}O y i:5 j Report a mu Prevent Recurrence oO 6
10 8/4/78 F
7.02 11 3
None N/A N/A Voltage transient catised by lightning i
storm.
When the lightning struck the trdnsmission lines a voltage spike was produced causing erroneous scram sig-nals resulting in an automatic scram.
T 4
(M (w
N Lcs2) i W
fi 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduleil A Equipment Failure (Explain)
I-Manual for Preparation of Data
- n. Maintenance of Test 2-Manual Scram.
Entsy Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Repoit (I.ER) FilelNUREG-D-Regulatory Resiriesiini 4-Other (Explain) 0161)
E Operator Training & License lixamination F Administrative 5
G-Operational Error (Explain)
Exhibit I-Same Source to/77) 11-01her (Explain)
. = _
l DOCKET NO.
50-29 UNIT YANKEE ROKE DATE 780911 COMPLETED BY R.M. Siocren TELEPliONE (617) 366-90i1 X2281 REPORT MONTi{
August, 1978 4
SU:f!ARY OF-OPERATING EXPERIENCES i
8/4 At 0303 hours0.00351 days <br />0.0842 hours <br />5.009921e-4 weeks <br />1.152915e-4 months <br /> a turbine trip and reactor scram occurred as a result of an electrical storm. At 0727 the reactor was brought critical and at 1004 the turbine generator was phased to the i
grid. At 1050 the plant load was 30 MWe.
At 1215 the plant load wa:, held at 47 MNe because of high chloride concentration in j
No. 1 and 4 steam generators. At 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> the analysis of the steam generators' water chemistry was within specifications and the i
plant load was increased at 18 MWe/hr. (10%).
At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, with l
plant load at.145 MWe, a hold in power escalation was begun for j
xenon equalibrium.
8/5 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> plant load was increased and at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the plant was operating at approximately full power.
}
i
)
I i
x-r 3
y 1-ym v,
$f $ Of REGULATORY INFORMATION DISTRIDUTION SYSTEM (RIDS)
DICTRIBUTION FOR INCOMINO MATERIAL 50-029 REC:
ORO: MOODY D E DOCDATE: 09/11/78 NRC YANKEE ATOMIC ELEC DATE RCVD: 09/14/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED SUDJECT:
LTR 1 ENCL 1 FORWARDING SUDJECT FACILITY"S MONTHLY OPERATING REPT FOR THE MONTH OF AUGUST, 1978.
PLANT NAME: YANKEE ROWE REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: $
- ocoon*********** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
ANNUAL. SEMI -ANNUAL & MONTHLY OPERATING RPTS (OL GTAGE)
(DISTRIDUTION CODE A008)
FOR ACTION:
BR CHIEF ORDH2 DC**W/6 ENCL INTERNAL:
REG FILE W/ ENCL NRC PDR**W/ ENCL T
'c"'
s2 ENCL MIPC**W/2 ENCL HANAUER**W/ ENCL DIRECTOR DOR **W/ ENCL AD FOR CYO & PROJ**W/ ENCL ENGINEERING BR**W/ ENCL REACTOR SAFETY BR**W/ ENCL PLANT SYSTEMS DR**W/ ENCL EEB**W/ ENCL CORE PERFORMANCE BR**W/ ENCL EFFLUENT TREAT SYS**W/ ENCL EXTERNAL:
LPDR'S GREENFIELD. MA**W/ ENCL NATL LAD ORNL**W/ ENCL TERA **W/ ENCL NSIC**W/ ENCL BROOKHAVEN**W/ ENCL ACRS CAT B**W/16 ENCL I
DISTRIDUTION:
LTR 43 ENCL 43 CONTROL NBR:
780820299 512 E: 1P+5P
++++***ow*
+
a**uct-****************************
THE END D +N h oM rNr
. ok b o Ju. b
. $Ird NCW Y
%.