{.)'fi

',.A TcIfphon3 617 366-9011 TwX 710-390-0739 WYR 76-49 YANKEE ATOMIC ELECTRIC COMPANY uvr,6-44 kHY 76-51

  • ~ ~,

lapN.

20 Turnpske Road Westborough, Massachusetts 01581

.YANKfE s

April 27, 1976 k j O

-Qp%

e g

United States Nuclear Regulatory Co:nnission U@g\\h

~

_g Washington, D. C.

20555 p_

~'

g Attention: Office of Nuclear Reactor Regulation b

//

Victor Stello, Jr., Director Division of Operating Reactors 4

~

Reference:

(a)

License No. DPR-3 (Docket No. 50-29)

(b) License No.'DPR-28 (Docket No. 50-271)

(c) License No. DPR-36 (Docket No. 50 '.s9)

(d)

USNRC Letter dated April 9, 1976, V. Stello to D.E. Vandenburgh in re YOQAP-1.

(e) YAEC Letter dated April 16, 1976, L.H. Heider to V. Stello.

(f) USAEC Letter dated March 8, 1973, E. M. Howard g 7i h to D. E. Vandenburgh.

(g) USAEC Letter dated March 16, 1973, E. Morris JN 7 Howard to L. E. Minnick.

,.x[ '

(h) USAEC Letter dated March 20, 1973, E. Morris

/,.' >

~ d'#

Howard to W. P. Johnson.

(i) USNRC Inspection Report No. 75-18; License No.

f-'

R

\\

~

h DPR-36; Docket No. 50-309).

(j)

USNRC Inspection Report No. 76-06; License No.

DPR-3; Docket No. 50-29.

J (k) USAEC Letter dated June 19, 1974, Robert A. Purple '

't to G. Carl Andognini.

(1) YAEC Letter dated July 23, 1974, Louis H. Heider to Pobert A. Purple.

Copies of References (d) through (1) attached.

Dear Sir:

In response to your letter dated April 9, 1976 concerning the Yankee Atomic Electric Company Quality Assurance Program (Reference d) and as amplification of the Company's prelimina y assessment of that corre-spondence. (Reference e) the following is submitted:

A formalized Quality Assurance Program was developed in 1973 concurrent with the licens!.ng process for the Vermont Yankee facility-.' '

This program evolved from a joint effort that commenced in 1971 between 106,0-]$T

(#

^-

[

United States Nuclear Regulatory Commission April 27, 1976 Office of Nuclear Reactor Regulation Page Two Attn the then AEC, DORO, (currently Inspection and Enforcement) and Yankee; the program was based on the criteria of 10CFR, Part 50, Appendix B as interpreted by AEC, I&E.

The Vermont Yankee Quality Assurance Program was approved by the AEC on February 21, 1973 with written confirmation thereof on March 8, 1973 (Reference f).

On the basis that the Vermont Yankee Operational Quality Assurance Program was also applicable to Yankee Rowe and Maine Yankee, the AEC simultaneously (on February 21, 1973) approved the Program for application at all three facilities.

Written confirmation from the AEC for the Yankee Rowe and Maine Yankee Plants was issued in AEC letters dated March 16, 1973 (Reference g) and March 20, 1973 (Reference h), respectively.

At the time of the aforementioned events the AEC, DOL (currently Division of Operating Reactors) was not involved in these activities; however, a reasonable program was developed that all concerned could to the fact that, understand. Perhaps this was due, at least in part, much of the work of I&E personnel is directly involved in field activi-ties, and they are thus more cognizant of those areas where the major benefits of the program can be realized.

At this point the Company emphasizes that a formal Quality Assurance Program has been in effect at all three of our operating Plants, since In addition, the Program has been extensively audited by the NRC -

1973.

I&E at the Maine Yankee Plant In October,1975 (Reference i); and at the Yankee Rowe Plant in February, 1976 (Reference j). The results of these audits attest to the strength and effectiveness of our Program.

a letter was received from AEC - DOL (Reference k)

On June 19, 1974, that requested additional information necessary to complete a DOL ovaluaticn of our already AEC spproved Quality Assurance Program for our Yankee Rowe Plant.

While Yankee found Reference k somewhat confusing, we replied in turn on July 23, 1974 (Reference 1).

This letter contained references (NRC) to documents which verified that we did indeed have an AEC However, your staff would not accept our position; approved Program.

1974. At that therefore, we agreed to a meeting or. Septenber 24, eeeting the AEC gave the Company two options; to submit a " Topical Report" applicable to all three operating Plants or as an alternative 19, 1974 letter to. Provide the information demanded in the June (Reference k), specific to Yankee Rowe. -In addition, it was interated at the meeting that if the company decided to provide the added infor-mation for Yankee Rowe, we would be directed at a later date to provide additional information relative to the Quality Assurance Program for the Maine Yankee and Vermont Yankee Plants. Your staff also stated theIn additional information requested would be unique for each plant.

other words, a Topical Report was required or we should be prepared to provide three individual programs.

Yankee yielded to this "backfit" and agreed to write a Topical Report, with submittal due on or before May 1, 1975.

f 4

l

=

United States Nuclear Regulatory Commission April 27, 1976 Attn: Office of Nuclear Reactor Regulation Page Three Our April 1975 submittal of YOQAP-1 addressed the Rainbow Books and their endorsed ANSI Standards, but not to your satisfaction.

It did not meet the requirements of your Standard Review Plan which we did not know existed until August 1975.

(Attachment 10)

In addition, since our submittal of YOQAP-1 in April of 1975 the NRC has revised the Standard Review Plan five times and changed its position relative to the

" Rainbow Books"'and ANSI Standards three times.

1975 ceeting with your staff, your Mr. R. Vollmer During an August, indicated to us that if we addressed ANSI-18.7, upon its final issue, we would not be required to address the Rainbow Books and their contained (Attachment 11)

Our March, 1976 meeting with your Regulatory Guides.

staff was to firm up exactly which Regulatory Guides and/or ANSI Standards were then applicable. At that meeting your Mr. J. Gilray informed us that ANSI-18.7 was at the printers and was acceptable to the Nuclear Regulatory Commission.

Mr. Gilray reiterated that if we addressed ANSI-18.7 in our Topical Report, we would not be required to address any of the Regulatory Mr. Gilray also stated that we would be required only to address Guides.

current issue Standards referenced in ANSI-18.7; and, if these referenced Standards were revised, we would not be required to address the revisions unless they had a major effect on our Program. Our Staff considered the NRC proposal and accepted it.

In April 1976 our Mr. David B. Pike, Manager of Operational Quality Control & Audit, contacted your Mr. J.

Conway requesting written verification that ANSI-18.7 was the governing document for an acceptable Quality Assurance Program for operating nuclear Your Mr. Conway stated that ANSI-18.7 was not the governing power plants.

document and disavowed the conversation between Mr. Gilray, himself and our Messrs. D. Pike and R. Martin in April, 1976 at your offices.

Mr.

Conway stated that in addition to addressing ANSI-18.7 we would be required to address approximately 12 Regulatory Guides including a revision to Regulatory Guide 1.33 which would not be issued until sometime between June and October, 1976. Again, this is contrary to what Mr. Gilray had stated at the March, 1976 meeting.

In essence, Yankee views the current situation as one in which NRC desires that the Company commit to all ANSI standards and in particular to the NRC published and non-published regulatory guides that are pertinent to the subject. In many instances, the regulatory guides have been hastily promulgated, are more restrictive (not necessarily better) than the ANSI standards and are subject to varying interpretation; however, once committed, an cperating plant will be audited to these documents on a line by line, word by word basis by NRC, I&E, Yankee would be performing in a most unprofessional manner to accept this situation in behalf of our partici-The Company will not agree to connit to ever-changing pating plants.

criteria until such criteria is stabilized and then closely analyzed and the proper exceptions are taken.

Your Staff's positions have been a moving target since 1971.

Your request that we submit our revised YOQAP-1 no later than August 1, 1976 The establishment of a firm list of Standards, is unacceptable to us.

Guides, etc. to be imposed upon us relative to our existing Quality

(

United States Nuclsar Rigulatory Commission April 27, 1976 i

Attn Office of Nuclear Reactor Regulation Page Four Assurance Pro' gram, has yet to be achieved. Until such time as the NRC can internally agree upon such a list of documents and issue it to us in writing, we find it impossible to agree to a submittal date When this for a revision to our existing Quality Assurance Program.

is done Yankee will perform the required analysis of the pertinent material and, hopefully, both parties can then proceed in an organized manner to develop the most effective quality assurance program possible.

We at. Yankee realize that when changes in organization occur, opportunity arises for misunderstanding and misinterpretation of what has already transpired. We at Yankee take careful measure to assura continuity of management policy.

It is for this reason that we include as attachments hereto, documentation of meetings and phone conversations between Yankee and NRC personnel relative to our Quality Assurance We invite your review Program for operational plants (Attachments 1-20).

of these documents in the hope that perhaps a better understanding can be reached concerning'the Company's frustration with the NRC performance in this area.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY Louis H. Heider Assistant Vice President - Operations LHH/kg Attachments (20)

Distribution:

See attached list.

I 4

I w

  • ^

T-"

U.S. NUCLE AR REGULATORY COM

'lON 00

,_ ZMZ 7 i [3 c 9 i fJi;C rORM 195 *

~

f177G!

9 NIIC DISTRIBUTION FOR PART 50 DOCKET MATERI AL FHOM:

OATE OF DOCWENT TO:

3; Yankc Atcrne Elec C0";~n'v 4-27-7t, Ues tbercu;;n, Macs DATE #4ECEIVED 433 L M Heider CLETfER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED CORIGIN AL guNCLASSIFIED 3 signea O copy E N CLOSU RE 1 DE SCRIPTION I

'.tr re :ur C u-M ltr....trcns the Responscs,t0 ious picCOs of T20 correspen-j nence (a 11:tg on trans 'itr) cenCernin; t o i. h

.3 ;

r,uality Assurance ? roc.rar..................

AN 6

g6

! PLANT NAME:

Enec

'c'?,

"t '.'a nkc c, Mainc Yankee i

SAfr%Y FOR ACTION /INFORMATION ENVIRO

-W-m c.'

i ASSIGNElflD :

ASSIGNED AD :

h/

BRANCll Chl:P :

PoroIc /Re.id 3 RANCH CHIEF :

PROJECT l'ANAGER:

B o r e c_ r / pip J d fee PROJECT MAS /.GER :

m 2~EfC. AS$T. :

c; M y,. d LIC. ASST..

v YnSU*

i INTERNAL DISTRIBUTION r

M R_FIl SYSJ'K11S_JAFETY PLANT SYSTFMs vwren TFCH L/

NRC PDR HEINEliAN TEDESCO ERNST

!/

I_& E (3l SCHROEDER BENAROY?,

j EALL4RD

!/

QELD LAILMS SPANGLER COSSICK & STAFF ENGI1]EE11UiG IPPOLITO SITE TECH L_ _MIEC MACCARY KNIGliT OPERATING REACTORS GAMMILL L_._ CASE STEPP L

.. _ IMiWHER _

SIllWEIL STELLO liUDIAN L

___llARLESS PAULICKI OPERATING TECH L_ PROJECT liANAGEMENT REACTOR SAFETY

/ EISENilUT SITE ANALYSIS l

~

/

SHA0 VOLU:ER y

_BOYD ROSS

?. COLLINS NOVAK

/

BAER BUNCH l7

/, SCHWENCER J. COLLINS L,

Il0USTON ROSZTOCZY

/

GRIMES KREGER C

PETERSON CllECK MELTZ g

IlELTEMES AT & I SITE SAFETY & ENVIRC

/

SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER

^

i EXTERNAL. DISTRIBUTION CONTROL: NUMBER BROOKilAVEN NATL LAB

(,

_ QDR: x.s i, e l./,Hm NATL LAB

/

TIC A.d Li by Vy REG. V-IE ULRIKSON(ORNL)

I9 7

/

NSI.C M : <

e e 4 4 L LA PDR__

/- - J ASLB CONSULTANTS

. Z _ACas i e 1191212GLS5 W MM < n <

1

.)

3 1