l Telephoru 617 366-9011 j
e'
,,o >.a.ers.
"ra 's-"
YANKEE ATOMIC ELECTRIC COMPANY 20 Turnpoko Road Westborough, Massochusetts 01581
.Yn"%*
.ep a f, _y mxue August 6, 1976 N
[,,
g United States !!uclear Regulatory Commission f
[% S g 1975x Washing *.on, D. C.
20555 1
Attention: Office of tiuclear Reactor Regulation S
/
Mr. Robert Purple S
Reference:
(1)
License lio. DPR-3 (Docket !;o. 50-29)
(2) !!RC letter dated February 19, 1976 (3) Yankee letter to !!RC dated June 2,1976, WYR 76-63 (4) tiRC letter dated July 2, 1976
Dear Sir:
4 -
In your letter to Yankee Atomic Electric Company (Reference 2),
you requested that certain information be supplied for the purpose of evaluating the station's compliance with Appendix I to 10 CFR 50.
Yankee submitted on June 2,1976 (Reference 3) that portion of the information you requested which meets the requirements of Section V.B of Appendix I, and indicated that in addition radiological dose analyses would be performed by Yankee Atomic and submitted to the Commission by August 6, 1976.
In the preparation of the radiological dose assessment, several meteorological dispersion models were required to be developed for computerization. The effort required to corplete the meteorological modeling and debug the computer codes was underestimated. As a result, the dose assessment could not be finalized by August 6 as indicated.
It is helieved that the necessary modeling will be completed shortly, allowing the radiological dose analysis to be submitted by August 31, 1976.
This delay in submittal of the dose assessment does not extend beyond the 90 day response time indicated in your letter of July 2, 1976 (Reference 4) which requested additional informa*. ion for Appendix I evaluation.
Therefore, it is not expected that the additional time requested to complete the dose analysis will interfere with the scheduled review of Yankee's compliance with Appendix I.
Any question regarding this information should be directed to Mr. Peter Littlefield, at our Engineering Cffice in Westboro, Massachusetts.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPAliY
~
c.,).,nm l.-
W M
h 06 0 7Gr c>
' L
?="ch 0
Manager of operations L
rt
u.0. NUCLC AR HEGVLATOH Y COMMi4edieuJ' DOCV.ET NUM ETE M 50 29 qqCponu 105
- m N30 DISTRIBUTION ron PART 50 DOCKET MATERIAL DATE OF DOCUMENT FROM:
-_TO:
Yankee Atomic Electric Company 8/6/76 estboro, Mass.
DATE meetiveo N. R. C.
J. L. French 8/9/76 NUMBER OF COPIES RECElvf D WPUT FORM NETren ONOTOHlZED Three signed FMoP gonic'9L
,MU N C t. ASSlF iE o DCcPY E.N CLOSU PE w.
DESCnlPTION 2/19/76 & 7/2/76 itrs, and their Ltr. ro our 6/2/76 ltr..... furnishing requested information concerning evaluation of the station's compliance with Appendix I to 10 CFR 50.
l APPENDIX I DISTRIBUTION AFTER ISSUANCE OF A LICENSE b
(1-P)
/{~
Plant Name:
Yankee Rowe l
R.ft FOR ACTION /INFORMATION 8/10/76 j
ACSIG:!ED AD:
J ASSIGUED AD:
ERA :CH CHIEF:
, F( FRANCH CliI:2:
(3 Schwencer 1
PROJECT !%' AGER:
[g/ FflOJECT E :laZ3*
Burger
}
LIC. ASST.:
4 Sheppard
[{# LIC. ACCT.;
l INTERNAL DISTRIBUTION l
Emfipo 7:cg
- -- ' 3
)
GISTE"S SAFETY PLtdc gisTg,S l
FsG FfLE HEUTE'AN TED7400
_i iR' ST 6/
- !4ptn t'7!PC PD3
((_1&E(2.)_
ECliR0] DER FE':AFpyA quem:0 IAn:As 3 0:1n E :GI iEERT*!G IPFOLTTO SITE TECH g,00SSTCK& STAFF
__I t'Onol OPFFATTNG T:XCTORS
/
C;xtiLL
_ IIPC KNTGHT CASE SfiEEIL STELIh SIE?P PAWLICKI i
g/l EJL"AU HAHAVER
_g/gggrg OPERATI!!G TD H a#
((@R[N SITH A!!ALYSIS EISE;WJT REACTOR SAFETf S1*AO VOLL:2R JL9nJ FTTEGACE T!T ROSS l
EUUCH jnyD rAEF NOVAK ROSZTOCZY
_g;2 ;aM]kdt LCT 8/
J. COLLTUF J E LLT7S
[jpJy3'I g
CRi:is y
KREGER CHECK
~ lIN[5'I
~
/ _Q&RdC.Rf Pi m ' E 0:7 SITE SAMd & ENVJF0 AT & I HE1/TE:ES ANALYSIS
~
SALTZ"AN SKd7iioi,T
, d DE'TIO!I & !!JLLTR, L{t j
~ '
HITTEERO l
CONTROL NUMBE R
-,!A~..'J AL DISTHiliUTit W7 'T00N!" ~1; UATL L/ '
]
EXT Eli i
LL L
L
'_dgLPIR: Crecr_fie1d. Mas 1 __
ULRIKCON (01UM
,/
hEJ.
5.i f E m nt\\n 3 0 g./
gf
.p t c
~ L PD3 V tdIC CO::SULTA::TS @[F ~ _M)
Hytu/llll6@l n\\lL
/
~X
- ~ 77S 22
- .. M..mpo lrTU_ m_n (uj ugueuuu-Am.0
,g.
.C..T.S..( i m