Discusses Results of Investigation Re non-Category 1 Equipment Failure.Temporary Protective Measures,Schedule for Completion of Permanent Mods & Insp Program Which Have Been Instituted in Response to Also Discussed
ML19339B248
Person / Time
Site: Yankee Rowe
Issue date: 01/20/1975
From: Vandenburgh D
YANKEE ATOMIC ELECTRIC CO.
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
WYR-75-9, NUDOCS 8011060596
Download: ML19339B248 (6)


Text

_

2 C-C-

O Regu;atory Dedet File.

7.,,,som.

6i7 366 90ii 780 390 0739 YANKEE ATOMIC ELECTRIC COMPANY m R,5-9

'"i 20 Turr. pike Road Westborough, Massachusetts 01581

.YA6' xe!)s-January 20, 1975

/

/

/'

'i ll

.)

1

-m

-~

nited States Atomic Energy Commission

(,

J

' l' Kn hington, D. C.

20545 Oirectorate of Licensing

ttenticn

Q iefertnec:

(a) License No. DPR-3 (Docket No. 50-29)

_ r X...'N

%' b.

(b) USAEC letter to YAEC dated 12/17/74

\\

(c) USAEC letter to YAEC dated 8/8/72 4

7 (d)

YAEC letter to USAEC dated 9/8/72 g,

ll 05

\\

YE 2

E.cicsures: (1) Figure 1 - Site Building Arrangement pad (2) Figure 2 - Primary Auxiliary Building arq Diesel Generator Building (f.-

[ k A

(3) Figure 3 - Ground Floor Turbine Room y

g M

(4) Figure 4 - Turbine Room Elevations 6

c.r Eir

y g

n response to Reference (b), we conducted an investigation at the tankee Ecwe plant to determine whether the failure of any non-Category I hxicric) equipment could result in flooding or release of chemicals tha t could jeopardine safe shutdown of the facility. This investigation carried cut in accordance with the AEC criteria entitled, " Guidelines war fcr Feview of Non-Category I Systems Whose Failure Could Cause Flooding cf Ecfety Eelated Equipment".

This report discusses the results of the investigation, the temp:rary prctective measures which were determined necessary; a time schedule for c:r.riction of the permanent modifications and an inspection program which has been instituted and will rerain in force until the permanent modifi-caticns have been completed.

GENE A*. ::'FCFFATION The Yankee Nuclear Power Station was not designed to the seismic critcria new in effect; consequently, the piping systems are classified as safety Eelated or non-safety related rather than by a seismic category.

All of the applicable non-safety related systems in Reference (b) were included in our investigation, specifically:

O'

' 0 0 $ 1 0 (y Q $

{

}>

==

v j

6.

Q

'l

'f' United States Atomic Energy Commission January 20, 1975 ttn: Dir.ectorate of Licensing Page Two it Service Water Demineralized water Condensate Drains Feedwater Heating Boiler Condensate Reactor Building Cooling Water Make-up Circulating Water Potabl'e Water Fire Protection PLANT SHUTDCWN The Turbine Building and Primary Auxiliary Building contain safety related equipment required for safe shutdown of the plant. Heat removal can be provided by the equipment located in either building. These buildings are separated as shown in Figure 1; therefore, simultaneous flooding of both buildings from a single pipe rupture is not possible.

The Control Room and Switchgear Room are located in the Turbine Building and the emergency diesel generator and safety injection pumps are located in the Diesel Generator Building with interconnecting cables between the two buildings.

TUREINE BUILDING The Switchgear Room and Control Room, shown on Figure 4, are located in the Turbine Building at El. 1037'-8", and 1052'-8", respectively. The i

floor of'the Turbine Building is at ground level, El. 1022'-8".

Flooding of the Switchgear Room cannot occur, unless the entire Turbine Building were flooded to a depth greater than 15 feet. This is considered a highly-unlikely event because of the many doors and openings to the outside.

In addition, submergence of non-safety related equipment in the Turbine Building would result in equipment trips and thereby alert the operator to the mal-function.

FRIMARY AUXILIARY BUILDING Service water, component cooling water, demineralized water, and heating system condensate is routed through a room in the lower level of the Primary Auxiliary Building. This rocm is shown on Figure 2.

A rupture of any of these systems, which results in a water depth in excess of one foot could flood out Motor Control Center 4 and prevent operation of the charging pumpsi which are needed for heat removal, and the purification pumps, which are needed for-post-LOCA, long term recirculation. While the heat removal function of the charging pumps could be provided by equipment in the Turbine Building, long term recirculation could not. Therefore, the purification pumps must remain functional.

l DIESEL GENERATOR BUILDING The Diesel Generator Building contains the three diesel generators and Emergency Buses 1, 2 and 3, which are required in the event of a loss of offsite power, and-the safety injection system which is required for both shutdown and the design basis accident- (LOCA). No non-category I

~

~

e.

U

(;.:

!}

United States Atomic Energy Commission January 20, 1975 Attn: Directorate of Licensing Page Three

1 piping of any size. passes through this building and flooding is not
j considered a possibility. The connecting door between Primar? Auxiliary Building and the Diesel Generator Building is maintained in a closed position since it is equipped with an automatic do-
loser.

1 DESCRIPTICN OF REQUIRED CHANGES Flooding of vital areas will be prevented by the following modi-fications:

1.

Sufficient openings will be provided in.the Primary Auxiliary Building to prevent the flooding of Motor Control Center 4.

2.

Redundant alarms will be installed in the floor sump to alert the Control Room operators of increasing water level in the Primary Auxiliary Building.

3.

Means will be provided to guarantee that leakage under the connecting door between the Primary Auxiliary Building and the Diesel Generator Building cannot impair the operability of the 480V switchgear. comprising Emergency Buses 1, 2 and 3.

At present, several alternatives are being considered which include door seals, drainage paths, berms, etc.

The details of this modification will be submitted as soon as the design is finalized.

It is anticipated that this information will be available within the 30 day period allotted.

SCHEDULE OF CHANGES The schedule for completion of Items 1 thru 3 is expected to be:

Item l' April 30, 1975 Item 2 April 30, 1975 Item 3 March 1, 1975 Until the above modifications are completed, YAEC intends to:

1.

Provide an audible addition to the existing high sump level alarm which is located in the Primary Auxiliary Building.

2.

Initiate an hourly inspection by plant personnel. This.

inspection is to include verification of the closed position of the southwest inter-connecting door.

3.

Instruct Control' Room operators that changes in the service water flow may be the result of a rupture.

CHEMICALS A'.1 chemicals used in the plant are stored either in the Water

~

Treatr.ent Rocm or in'a warehouse; these are shown on Figure 1.

Thus,

C c

United St tes Atom c Energy Commission January 20, 1975 h

i

~ Cirectorate of Licensing Page Four

' Attn:

a pipe :.:pture in a non-safety related system could not cause the release of chemicals which would prevent safe shutdown of the plant.

We trust the above information is responsive to your letter and, of ccurse, we are prepared to discuss this matter at your convenience.

i-Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY k

D. E. Vandenburgh i

Vice President TWG/kg Enclosures i

4 b

4 1

i d,

,m7

, - - ~,

,3 e

-.,p 4

c-,---,,.

g y--

see.c. vane E

i J

r r

4 lirDl0Gt.N STORAG

(-

E 9

s. INJ.

S 8

l to!.E L,

_ _ q 3

f

+J y

~~

L.----

I

/

l OrrtCE 4Rc4 l

I A

  1. E U fUXILIARY BAY

)

VAPOR CONTAINER l

oavu r

3 was Ne i

i STORAGE ROOM WASTE Di$POSAL PRIMAR]Y l

DUILDING I

AUXILLARY

[*DKON.l HC ATING, SUILDING m

PLDG.

.c.

i ig g ieouR m

o i

s; :

gg

..g.

I +,1!

.g 2 g

ra j

.=_

=

k;-

c..

i WmR yepo.)

I

~

..na r- -

'"k*l?

Er :

I

__- g__. r.

v q

E O

l lhb%E = l =

courew sata p.sv r3 a =n n

i f=._

y--

7-

=

V4 g

g._ _ _. _.,

y f

\\

/

  • cggay poga
    • '*** L l

'w

~..-r, 3

1i

,w%

YANKEE NUCLEAR SITE BUILDING ARRANGDiENT Figure 1 IOWER STATION

- - - - -