Forwards IE Insp Repts 50-440/80-17 & 50-441/80-16 on 800826-28.No Noncompliance Noted
ML19339B060
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/18/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19339B061 List:
References
NUDOCS 8011060242
Download: ML19339B060 (2)


See also: IR 05000440/1980017

Text

_

.

.

-

-

.

..

--

.

_ _ _-__-

-

1

'

'

'o

UNITED STATES

.!"

'

. NUCLEAR REGULATORY COMMISSION

El ' n

.. . E

REGION ill

{'

8

799 ROOSEVELT ROAD

[ [(,7

-

d

o,

j

gv /

oteu sttvu. itunois sois7

.....

SEP 18 S00

i

+

1

Docket No. 50-440

Docket No. 50-441

'

4

.

The Cleveland Electric Illuminating

'

Company

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

'

Cleveland, OH 44101

Gentlemen:

4

!

This refers to the inspection conducted by J. E. Konklin of this office

on August 26-28, 1980, of activities at the Perry Nuclear Plant Project,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and

i

No. CPPR-149 and to the discussion of our findings with C. W. Groscup and

others of your staff at the conclusion of the inspection.

.

s

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

<

No items of noncompliance with NRC requirements were identified during

the course of thts inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as i 4 tows.

If this report contains information that you or

t

your contractors resieve to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

'

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa

j

tion identified in the application is contained in an enclosure to the

!

application.

!

1

801106O N b'

Q

.

.

-

--

.

The Cleveland Electric

-2-

SEP 1 a ggg

.

.

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

y

C

MWf{

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-440/80-17

and No. 50-441/80-16

cc w/ encl:

Central Files

Reproduction. Unit NRC 20b

PDR

Local PDR

NSIC

TIC

liarold W. Kohn, Power

Siting Commission

Mr. Daniel D. Wilt, Attorney

IIelen W. Evans, State of Ohio