ML19339B031

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/80-33 on 800813-15.No Noncompliance Noted
ML19339B031
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/03/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19339B032 List:
References
NUDOCS 8011060202
Download: ML19339B031 (2)


See also: IR 05000373/1980033

Text

-

.- .

.

..

g3 ftf G

TlQ

q

UNITED STATES

>'

!N-

NUCLEAR REGULATORY COMMif.SION

.'

n

E

REGION lli

j ..

'

8

799 ROOSEVELT ROAD

-

o,

8

GLEN ELLYN,ILLINOls 60137

g

,o

  • * " *

16EP. 0 3198@

!

!

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

'

Gentlemen:

'

This refers to the inspection conducted by Mr. D. E. Miller of this

office on August 13-15, 1980, of activities at LaSalle County Nuclear

Station, Unit I authorized by NRC Construction Permit No. CPPR-99 and

!

to the discussion of our findings with Mr. Bishop and others at the

'

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective

mmination of procedures and representative records, obser-

o

vations, and interviews with personnel.

,

1

l

No items of noncompliance with NRC wguirements sere identified during

i

the course of this inspection.

j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

i

2, Title 10, Code of Federal Regulations, a copy of this letter and the

t

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in~an enclosure to the

application.

,

.

i

1

8011060 201

&

i

- -

--

-

-

-

.

.

.

.- .

.

-

.

.

4

.

=,

Commonwealth Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

(2h'

__

h(Mw

e

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection

Report No. 50-373/80-07

i

cc w/ enc 1:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

4

Construction Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

,

l

Superintendent

i

Central Files

,

j

Reproduction Unit NRC 20b

i

i

AEOD

!

Resident Inspector, RIII

'

J

PDR

}

Local PDR

'

NSIC

l

Tic

'

Mr. Dean Hansell, Office of

Assistant Attorney General

l

!

i

l

!

.

'

1

.

- - -

- -

-

- - - - - - -

-

- . - - - -

.

- - -

. -

-

-

-

-

- -

- -

- .

.

- - - -

. -

- - -

- - -

- -

-

- - - . -

- - - - - - - - -

- .

-