ML19339A989
| ML19339A989 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/21/1980 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19339A990 | List: |
| References | |
| NUDOCS 8011060114 | |
| Download: ML19339A989 (3) | |
Text
t
-.m TEM h e ( jo,,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION 3
..j WASHINGTON, D. C. 20555
- ,, g g-October 21, 1980 Docket No. 50-336 Mr. W. G. Counsil, Vice President Nuclear Engineering & Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
On May 29, 1980, the Commission published a proposed rule, a new paragraph 50.48 and Appendix R to 10 CFR Part 50, concerning fire protection, which-sets forth the minimum acceptable fire protection requirements necessary to resolve contested areas of concern for nuclear power plants operating prior to January 1,1979.
We have reviewed all the information you have provided to date including your May 29,1980 letter regarding your fire protection program. Several of the open items indicated in our letter dated April 4,1930, remain unresolved.
The status of all previously identified unacceptable items is presented in the Enclosure 1 Table.
- is our Safety Evaluation of those items we now find acceptable. presents our requirements on modifications tha* would have to be made at your facility to resolve these open items in a manner that would meet the requirements of the proposed Appendix R.
Sincerely, fS v
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Enclosures:
1.
Fire Protection Review Status 2.
Safety Evaluation of Acceptable Items 3.
Staff Requirements to Resolve.0 pen Items cc w/ enc 1:
See next page
'e
.8011060 //f
-4
. Northeast Nuclear Energy Company cc:
Mr. John Shediosky William H. Cuddy, Esquire Resident Inspector /Millstene Day, Berry & Howard c/o U.S. NRC Counselors at Law P. O. Drawer KK One Constitution Plaza Niantic, CT 063E7 Hartford, Connecticut 06103 Mr. Charles B. Srin'< man Anthony 2. Roisman Manager - Washi gton Nuclear Natural Resources Defense Council Operations 917 ISth Street, N.W.
C-E Power Systems Washington, D.C.
20005 Combustion Engireering, Inc.
4853 Cordell Ave., Suite A-1 Mr. ' Lawrence Bettencourt. First Selectman Bethesda, Maryland 20014
. Town of Waterford Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Nuclear Energy Company ATTN:
Superintendent Millstone Plant Connecticut Energy Agency Post Office Box 128 ATTF: Assistant Director, Research Waterford, Connecticut 06385 and Policy Development Department of Planning and Energy Director, Technical Assessment Policy Division 20 Grand Street Office of Radiation Programs Hartford, Connecticut 06106 (AW-459)
U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 U. S. Environmental Protection Agency Region I Office ATTN:
EIS COORDINATOR John F. Kennedy Federal Building Boston, Massachusetts 02203 Waterford Public Litmrry Rope Ferry Road, Route 156 Waterford, Connecticut 06385 Northeast Utilities Service Company ATTN: Mr. James R. Himmelwright Nuclear Engineering and Operations P. O. Box 270
- Hartford, C,onnecticut 06101 O
e
e ENCLOSURE 1 FIRE PROTECTION REVIEW STATUS MILLSTONE UNIT NO. 2 00CKET'NO. 50-336 ITEM DESCRIPTION STATUS
- 3.2.1 Cable Spreading Area R
3.2.2 Protection of Redundant Cable Trays R
1 3.2.3 Smcke Detector Test C
e 3.2.4 Cable Fire Barrier Penetration C
j Test Data d
3.2.5 Primary Coolant Pump 011 Collection R
i System 6.0 Administrative Controls - Fire R
,l Brigade 1
i h
C - Complete R - Requirements necessary to meet proposed Appendix R 4
i
.,,,e.