Forwards IE Insp Rept 50-298/80-13 on 800908-11 & Notices of Violation & Deviation
ML19339A975
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/24/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML19339A976 List:
References
NUDOCS 8011060093
Download: ML19339A975 (2)


See also: IR 05000298/1980013

Text

1

l

UNITED STATES

/p" "'%9'o,

NUCLEAR REGULATORY COMM!55lGN

.V

/ 'n

R EGloN IV

"

I

' " . -' ( ) #' ( 1

3

611 RY AN PLAZA oRIVE, SUIT 21000

I

-

/ a[

ARLINGTON, TEXAS 76C12

--

  • '

,

%, ' O f

September 24, 1980

  • ...a

In Raply Refer To:

Docket No. 50-298/80-13

Nebraska Public Power District

ATTN:

Mr. J. M. Pilant, Director

Licensing and Quality Assurance

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This rc.fers to the inspection conducted by Messrs. M. Aneshansley, R. Spangler

and L. Yandell of this office during the period September 8 - 11, 1980, of

activities authorized by NRC Operating License DPR-46, and to the discussions

of the findings with Mr. L. C. Lessor.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Based on the results of this inspection it appears that certain of your activities

were not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Enclosure 1.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Code of Federal Regulacions.

Section 2.201 requires you to submit to

this office within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have been taken

by you, and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

Also, during this inspection, it was found that one of your activities appeared to

deviate from your commitment to the NRC as set forth in the Notice of Deviation

enclosed herewith as Enclosure 2.

Please submit to this office within twenty (20)

days of your receipt of this notice a written statement or explanation in reply

including the cause of the deviation and the steps you plan to take to assure

timely implementation and completion of corrective actions.

Your written reply

should include the date(s) when your corrective action (s) will be completed.

8011060 073

_

. . .

- - - _

.

_.

--

--

.-

..

.

,

l

Nebraska Public Power District

2

September 24, 1980

t

In accordance with Section 2.790 of the NRC's " Rules of Pr9ctice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If the report contains

l

any information that you believe to be proprietary, it is necessary that you sub-

mit a written application to this office within twenty (20) days of the date of

"

this letter, requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it is claimed

that the information is proprietary.

The application should be prepared so

that any proprietary information identified is contained in an enclosure to

4

the application, since the application without the enclosure will also be

placed in the Public Document Room.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

'

Room.

i

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

)

I

1

k3)(

!

G.j L

ladsen, Chief

((\\

Reacta: Operations and

Nuclear Support Branch

Enclosures:

I

1.

Notice of Violation

2.

Notice of Deviation

3.

Inspection Report No. 50-298/80-13

J

cc w/ enclosure

>

L. C. Lessor, Superintendent

Cooper Nuclear Station

P. O. Boy. 98

Brownville, Nebraska 68321