ML19339A931
| ML19339A931 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 08/26/1974 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML19339A932 | List: |
| References | |
| NUDOCS 8011050714 | |
| Download: ML19339A931 (2) | |
See also: IR 05000029/1974009
Text
i
b
UNITED $TATES
,
/
ATOMIC ENERGY COMMISSION
y Ni -
oincevoivate or acoucavoav occaarions
,t' m'l,j
acasons
c
. . / . .e
m
631 P ARK AVENUE
'
L;x.
KING oF PRUS$1 A PENNSYLVANI A 19406
.
MG2 61974
Yankee Atomic Electric Company
License No. DPR-3
Attention:
Mr. G. Carl Ancognini
Insp. No. 50-29/74-09
Assistant to Vice President
20 Turnpike Road
Westboro, Massachusetts
01581
Gentlemen:
This refers to the inspection conducted by Mr. Ruhlman of this
office on August 14 and 15,1974 at Yankee Nuclear Power Station,
Rowe, Massachusetts of activitics authorized by AEC License No. DPR-3
and to the discussions of our findings held by Mr. Ruhl=an with Mr.
H. Autio and ether ce=bers of your staff at the conclusion of the
inspection, and to a subsequent telephone discussion between Mr.
,
St. Laurent and Mr. Ruhlman on August 19, 1974.
.
Areas emined during this inspection are described in the Regulatory
Operations Inspection Report which is 2nclosed with this letter.
Within thess areas, the inspection consisted of selective examinations
,
of procedures and representative records, interviews with personnel,
and* observations by the inspector.
During this inspection, A0 74-3, involving instrumentation setpoint
drif ting out of Technical Specification requirements, was inspected.
We have no further questions regarding this matter.
In accordance with Section 2.790' of the AEC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
AEC's Public Document Room. If this report contains any information
,
that you (or your contractor) believe to be proprietary, it is
necessary that you malie a written application within 20 days to
.
this office to withhold such information from public disclosure.
Any such application =ust include a full statement of the
reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
.
p
_ . . . .
_.
.
-
,
..
' ~
A
.CRtSS4@......cms
_.....ffp <sp
_,
0,'}\\,
Ruhl
ic
Streeter
McCab,e
,Brunne,r _ ,_
11
,
,
,
...r/.e. t.,.
.
E4
onn ,
.
. . . . . . wyn _
.
. . . .
..
....
-
.
,
..
..
Amasa AEr.4te s Ae, 9131 AECM 0244
\\ NY
8 0 u oso 7/y
9
. . . -_ -_ .
.
..
.
- . _ -
- -
- -
-
,
'
.
.
2-
information identified in the application is contained in a
-
i
- perate p tre of the document. If we do not hear from you in
this regar_1 within the specified period, the report will be
placed in the Public Document Room.
No reply to this letter is required; however, if you should have
any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
- -
-
-
,
Eldon . Brunner, Chief
)
~
Reactor Operations Branc't
Enclosure:
10 Inspection Report No. 50-29/74-09
cc: Mr. H. Autio, Plant Superintendent
Mr. Donald G. Allen, President
bec:' RO Chief, FS&EB
RO:HQ (4 cpys. of ltr., 5 cpys. of report)
RO Piles
'
Central Mail & Files
Directorate of Licensing (4 cpys of ltr. ,13 cpys. of report)
Regulatory Standards (1 cpy. of ler. , 3 cpys. of report)
Local PDR
DTIE
State of Massachusetts
Regional Regulatory Reading Room
RO Directors (II, III, IV) (Report Only)
,
,
MC
,
.
!
!
!
.