Forwards Insp Rept 50-029/74-09 on 740814 & 15.Noncompliance Noted
ML19339A931
Person / Time
Site: Yankee Rowe
Issue date: 08/26/1974
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML19339A932 List:
References
NUDOCS 8011050714
Download: ML19339A931 (2)


See also: IR 05000029/1974009

Text

i

b

UNITED $TATES

,

/

ATOMIC ENERGY COMMISSION

y Ni -

oincevoivate or acoucavoav occaarions

,t' m'l,j

acasons

c

. . / . .e

m

631 P ARK AVENUE

'

L;x.

KING oF PRUS$1 A PENNSYLVANI A 19406

.

MG2 61974

Yankee Atomic Electric Company

License No. DPR-3

Attention:

Mr. G. Carl Ancognini

Insp. No. 50-29/74-09

Assistant to Vice President

20 Turnpike Road

Westboro, Massachusetts

01581

Gentlemen:

This refers to the inspection conducted by Mr. Ruhlman of this

office on August 14 and 15,1974 at Yankee Nuclear Power Station,

Rowe, Massachusetts of activitics authorized by AEC License No. DPR-3

and to the discussions of our findings held by Mr. Ruhl=an with Mr.

H. Autio and ether ce=bers of your staff at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr.

,

St. Laurent and Mr. Ruhlman on August 19, 1974.

.

Areas emined during this inspection are described in the Regulatory

Operations Inspection Report which is 2nclosed with this letter.

Within thess areas, the inspection consisted of selective examinations

,

of procedures and representative records, interviews with personnel,

and* observations by the inspector.

During this inspection, A0 74-3, involving instrumentation setpoint

drif ting out of Technical Specification requirements, was inspected.

We have no further questions regarding this matter.

In accordance with Section 2.790' of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

AEC's Public Document Room. If this report contains any information

,

that you (or your contractor) believe to be proprietary, it is

necessary that you malie a written application within 20 days to

.

this office to withhold such information from public disclosure.

Any such application =ust include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

.

p

_ . . . .

_.

.

-

,

..

' ~

A

.CRtSS4@......cms

_.....ffp <sp

_,

0,'}\\,

Ruhl

ic

Streeter

McCab,e

,Brunne,r _ ,_

11

,

,

,

...r/.e. t.,.

.

E4

onn ,

.

. . . . . . wyn _

.

. . . .

..

....

-

.

,

..

..

Amasa AEr.4te s Ae, 9131 AECM 0244

\\ NY

8 0 u oso 7/y

9

. . . -_ -_ .

.

..

.

- . _ -

- -

- -

-

,

'

.

.

2-

information identified in the application is contained in a

-

i

perate p tre of the document. If we do not hear from you in

this regar_1 within the specified period, the report will be

placed in the Public Document Room.

No reply to this letter is required; however, if you should have

any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

  • -

-

-

,

Eldon . Brunner, Chief

)

~

Reactor Operations Branc't

Enclosure:

10 Inspection Report No. 50-29/74-09

cc: Mr. H. Autio, Plant Superintendent

Mr. Donald G. Allen, President

bec:' RO Chief, FS&EB

RO:HQ (4 cpys. of ltr., 5 cpys. of report)

RO Piles

'

Central Mail & Files

Directorate of Licensing (4 cpys of ltr. ,13 cpys. of report)

Regulatory Standards (1 cpy. of ler. , 3 cpys. of report)

PDR

Local PDR

NSIC

DTIE

State of Massachusetts

Regional Regulatory Reading Room

RO Directors (II, III, IV) (Report Only)

,

,

MC

,

.

!

!

!

.

I

I

,

n

. .

-- .

,

0

1

- -

,-

.

,

_

_,,_.---..__y

_ ,

. __