ML19339A804
| ML19339A804 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/30/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19339A805 | List: |
| References | |
| NUDOCS 8011050290 | |
| Download: ML19339A804 (2) | |
See also: IR 05000364/1980032
Text
i
,
o
UNITED STATES
!b
~ * ,
?
NUCLEAR REGULATORY COMMISSION
n
.{
$
REGION 11
2
e
101 MARIETTA sT., N.W., sulTE 31'O
'
"%
[
ATLANTA, GEORGIA 30303
SEP 3 01980
In Reply Refer To:
RII:HLW __..
d OT364/80-3D
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by H. L. Whitener of this office on
August 20 through 22, 1980 of activities authorized by NRC Construction Permit
No. CPPR-86 for the Farley facility, and to the discussion of our findings held
with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
i
any inf rmation that you (or your contractor) believe to be proprietary, it is
necessa y that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
4
E.c. &
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
See Page 2
k
-
- - . .
-.
-
-
.-
.
.
ee>
-
er
y
. - , .m
r
so-4
o
Alabama Power Company
-2-
(
SEP 3 01980
Enclosure:
Inspection Report No. 50-364/80-32
cc w/ encl:
A. R. Barton, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
.
l