ML19339A801
| ML19339A801 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/30/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19339A802 | List: |
| References | |
| NUDOCS 8011050281 | |
| Download: ML19339A801 (2) | |
See also: IR 05000364/1980035
Text
. .__
_
_
_
'[/O
'
g'# "D%
UNITED STATES
p.
&
4
)
NUCLEAR REGULATORY COMMISSION
o
i
E
'f
REGION 11
101 MARtETTA sT., N.W., sulTE 3100
ATLANTA, GEORGIA 30303
l
.....
In Reply Refer To:
SEP 301980
RII:GLT
c50'Y64dO5D
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by G. L. Troup of this office on
September 3-5,
1980, of activities authorized by NRC Construction Permit Np.
CPPR-86 for the Farley facility, and to the discussion of our findings held with
W. 3. Hairston, III at the conclusion of the inspection.
Areas examined during the inspection and our fin'.ings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
'
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
,
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questf<>ns concerning this letter, we will be glad to discuss
them with you.
Sincerely,
^
f.
.
,
J. P ilip St
r, Chief
Fuel Facility and Materials.
Safety Branch
,
.
Enclosure:
(See Page 2)
8011050 N.h .
.
.
-
-
-
.
.
..
. . _ _ .
._
- .
-
_ _
_
-
- -_.
. .
.
Alabsca Power Company
-2-
SEP 3 01980
.
Enclosure:
Inspection Report No. 50-364/80-35
!
- cc w/ enc 1:
A.'R. Barton,' Executive Vice President
1
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
2
W. C. Petty, Manager-Quality Assurance
(Design and Construction)-
W. G. Hairston, III, Plant Manager
.
R. E. Hollands, Jr., QA Supervisor
O. D. Kingsley, Jr., Manager, Nuclear Ergineering
and Technical Services
l
I
1
a
l
,
$
l
1
O
4 -
4
-
m.e
- s - =
r
--.-> een
- -m
e nw~n rm ,n-
> m
- - ~ ~~ w
a-w w
-u~w-~
-m
+ - -
-
~
s
-
~
p-
=+-
5
+-9i-
--e+
-
rp
--
p
y-
6
w- ' -