D f

4g UNITED STATES l

[.,

.y4 NUCLEAR REGULATORY 00MMISSION WASHINGTON, D. C 20555 Nf8 5

l

\\

YANyrE ATOMIC ELECTRIC COMPANY DOCKET N0. 50-29 YANKEE NUCLEAR POWER STATION (YANKEE-R0'WE)

AENDENT TO FACILITY OPERATING LICENSE Amendment No. 3G License No. DPR-3 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Yankee Atomic Electric Company (the licensee) dated March 5, 1976, complies with the standardt and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducteit without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment.

l l

80339g9 g

h

()

2-3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMilSSION 5

3 j

A.. chwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuan:e: September 3,1976 c

l 4

i

)

r

Q ATTACHENT TO LICENSE AMENDMENT N0. 30 FACILITY LICENSE NO. DPR-3 DOCKET NO. 50-29 Revise the Technical Specifications as follows:

Remove pages 214:5, 214:6 from the Final Hazards Summary Report and replace with revised identically numbered pages.

4 f

I o

,_..-..n g

- w

C C

214:5 main control board.

The source range and intermediate range signals actuate the 1.1 decade per minute circuit, but only the intermediate range signals operate the 1.h decades per minute circuit.

The startup rate scram is normally set to trip at 5.2 decades per minute and is adjustabic from 3 to 10 decades per minute. The source range l

and intermediate range signals can actuate individual channel bistable mag-netic amplifiers to initiate the scram.

7a addition to these signals, there exists ou cach one of the log microammeter units in the intermediate range channels an automatic signal, which disconnects the high voltage from the BF3 proportional counters when 4 and 105 ny and the reactor neutron flux is increasing between 5 x 10 reconnects the high voltage on decreasing flux at approximately the same level.

The information that this signal is initiated is obtained by the source range high voltage light mounted on the nuclear section of the main control board. The light is off when the high voltage is off.

A manual switch disconnecting the BF3 source range high voltage is also available at the nuclear instrumentation cabinets.

The coincidence feature makes it necessary for two out of six power range channels to initiate high neutron flux 1cvel signals in order to cause the scram amplifiers to trip. The high neutron flux 1cvel trip, set point is adjustabic for various reactor operation conditions.

For reactor 100*s full power operation, (i.e., 600 MWt), with four loops in service, the level trip set point is set at 108%.

For reactor operation between 0 and 15*. of full power, the level trip set point is manually adjusted to 35% of full power.

A power range coincidence singic switch is provided to allow for coincidence scram or any single channel scram. The low power scram set switch is located on the nuclear section of the main control board.

Signals not fed through the coincidence circuit but operating on the scram amplifiers through the alarm and scram panel are those initiated from low main coolant pressure, low pressurizer pressure, low steam generator icvel, high pressurizer levci, and high startup rate.

Provision is made in the alarm and scram panel to accommodate additional signals for memory light indication only.

A permissive relay circuit, shown on page 214:6, is provided which is operated by two millivolt bistables activated from two MWe thermal converters.

Operation of the circuit occurs at a generator output of 15 MWe. This circuitry provides for an optional manual by-pass for the low steam generator level scram, low flow scram and turbine-generator scram signals when the power is below 15 MWe.

At 15 MWe and above, the scram bypass is automatically removed. The high startup rate scram signal is automatically connected at 15 MWe and below, and automatically bypassed above 15 MWe.

A second permissive relay circuit is actuated, by a third millivolt l

bistabic and thermal converter, at the 130 MLe power -levci, which provides for automatic cut-in of a manual rods out reset circuit.

At power levels of 130 We and above, the reset circuit requires the control r, witch to be returned to the neutral or resct position before making each additional rods out step.

Below 130 MWe output, the reset circuit becomes Amendment No. 30

h h

214:6

~ "

POS. NO. 2 Battery l

AT POWER SUR TRIP TRIP

\\

/

\\

/

Trip BS423 BS420 A

On>15 A

On<15 MWe

f o

/ Close MWe (

Open j

p K3-2 y Bypass p

<15 MWe

<15 o

We

~

_1 gi K5-1

.g 7

K4-4 K4-3 KS-2 K1 K2 K3 K4 K5 g

' ~

NEG.

S.C. Level High SUR Me=ory Light N

/

1 1

1 j_

1

>"M.C. Flow r

g-

/

\\

Tripped" r-y 4-1 K2-1 IK K4-2 K5-3 IK3-1 y Signal V

V To Scram /cplifiers No. 2 Battery POS.

N

/

\\

Turb.-Gen.

Turb.-Gen.

A Trips Trips M.C.

N.C.

y s

/

s I *"

I *"

N N

Trip Trip Kl-2 K2-3

= Manual and Nucient

=

Trips BK-1 K-2 NEG.

PERMISSIVE RELAY CIRCUIT Amendment No. 30

-