ML19339A411
| ML19339A411 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 10/03/1974 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML19339A412 | List: |
| References | |
| NUDOCS 8011030773 | |
| Download: ML19339A411 (2) | |
See also: IR 05000029/1974012
Text
.
.~
.-~
. . ~ ~ -
-
-. _
.- -.
~-
.
-\\
UNIT 60 ST A TES
4Kih.,3
ATO*.HC CNCPCY CCW.;iG:ON
.
conrctosta te. or e.s vue.A turiv rwraia ts 3Ns
1g
ncwora e
16 5, , ' * I
E
631 P Af1K AVEque
.
Y,/ '
\\.\\
/
KING of* lRU$$! A. P?.tW$YLV4NI A tM"5
.
.my
.
OCT
3 1974
-
Yankee Atomic Electric Company
License No. DPR-3
Attention: Mr. G. Carl Andognini
Insp. No. 50-29/74-12
Assistant to Vice President
20 Turnpike Road
Westboro, Massachusetts
015B1
Gentlemen:
'
2
This refers to the inspection conducted by Mr. Sanders of this
office on September 17-18, 1974 at Rowe, Massachusetts of activities
i
authorized by AEC License No. DPR-3 and to the discussions of
our findings held by Mr. Sanders with Mr. Jones at the conclusion
,
of the inspection.
.
'
Areas examined during this inspection included: displacement of the
safety injection system pipe hangers, installation of hydraulic restraints
to the pressurizer, plant modifications for the effects of a postulated
-
pipe break outside cont..u . ant and thin wall valve verification program.
Within these areas, the inspection consisted of selective examinations
of proccfures and representative records, intervieus with personnel,
and observations by the inspector.
!
Within tl e scope of this inspection, no violations or safety
items were observed.
4
In accordance with Section 2.790 of the AEC's " Rules of Practice",
Part 2, Title .'O, Code. of Federal Regulations, a copy of this
letter and the aclosed inspection report will be placed in the
AEC's Public Docuent Room.
If this report contains any information
,
'
that you (or your 'ontractor) believe to -be proprietary, it is
'
necessary that you uke a written application within 20 days to
~
,
this office' to withho.d such information from public disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information
- e
is proprietary, and should be prepared so that proprietary
'
infor=ation identified in the application is contained in a
separate part of the document.
If we do not hear from you in
'
this regard within the specified period, the report will be
placed in the Public Document Room.
.
p
9
- e
~ ~ * .
30777
"
.so110
. _
9
-
.
.
.-
.
.
.
. .
-
. . -
.
.
.
. - _ .
. . _
..
-
- .. . _.. . .
-
- .
--
.
.
.
.
.
-2-
,
'
- .
'
s
No reply to this letter is required; hovever, should you have any
l
i
questions concerning this inspection, we vill ba pleased to discuss
i
i
them with you.
i
Eincerely,
,
4
-
i
. . ,
,
t .
t
-
Robert T. Carlson, Chief
l
Facility Construction and Engineering
}
Support Branch
.
Enclosure:
,
RO Inspection Report No. 50-29/74-12
,
4
]
cc:
R. Autio, Plant Superintendent
'
Donald G. Allen, President
!
R0 Chief FS&EB
f report)
!
bees , RO:RQ -(4 cpys of ler. , 5 epys o
l
,
RO Files
Central Mail & Files
l
DL (4 cpys of ler., 5 cpys of report)
l
RS (1 cpy of ler., 3 cpys of report)
.
'
i
l
Local PDR
!
State of Massachusetts
s
Regional Regulatory Reading Room (Report only)
RO Directors (II, III, IV)
I
l
i
I
!
!
]
r
'
.
. ..
__ ,
l
!
I
-
h
.
.
,
,- -.
,,
,
.-
._
,
r..--
-
.
y
,