@ Consumers Power Company Gereret offices: 212 West Michtgen Avenue, Jackson, Michigan 49201 + (517) 788-0550 October 28, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No 5 U S Nuclear Regulatory Commission Washington, D C 20555 DOCKET 50-155 - LICENSE DPR 37G ROCK POINT PLANT - TECHNICAL JPECIFICATIONS CHANGE REQUEST -
EMERGENCY CCRE COOLING SYSTEM REOUNDANT LINE Attached are three (3) original and thirty-seven (37) copies of a request to
.:hange the Big Rock Point Technical Specifications. The enclosed change provides surveillance requirements for new valving as.,ociated with a new redundant line which provides backup cooling water to the col' pray recirculation heat exchang-er.
The new redundant line provides a permanent piping system to replace the fire hose which has served this function previously.
The requested change is required to make the Big Rock Point Technical Specifica-tions accurately refelect the "as-built" condition of the plant and its surveill-ance requirements. The modification requiring the change vill be performed dur-ing the 1980 refueling outage scheduled to commence on October 31, 1980, and to terminate on December 15, 1980. Thereforr, approval of this change vill be re-quired during this period so that plant startup may be accomplished with appropri-ate Technical Specifications.
This change has been determined to be a Class III change pursuant to 10 CFR 170.22; a check in the amount of $h,000 is attached.
It should be noted that our Technical Specifications change request dated October 1, 1980, for the fire protection system automatic isolation valve also affects Section ll.h.l.h. A and that issuance of both changes concurrently would simplify Technical Specifications revision.
/m O [/
y W
~
David P Hoffhan Nuclear Licensing Administrator CC Director, Region III, USNRC NRC Resident Inspector - Big Rock Point 8011 080
[