ML19339A142

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/80-38 & 50-374/80-24 on 800826-28.No Noncompliance Noted
ML19339A142
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/26/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19339A143 List:
References
NUDOCS 8011030120
Download: ML19339A142 (2)


See also: IR 05000373/1980038

Text

L

'"q

UNITED STATES

87-

NUCLEAR REGULATORY COMMISSION

o

$ .y

eE

REGION Ill

o,

'[

799 ROOSEVELT ROAD

          • [

GLEN ELLYN,ILLINolS 60137

SEP 2 G 1980

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed-

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine inspection conducted by Dr. M. J. Oestmann of

this office on August 26-28, 1980, of activities at the La Salle County

Nuclear Station, Units 1 and 2 authorized by NRC Construction Permits

No. CPPR-99 and No. CPPR-100 and to the discussion of our findings with

Mr. R. Bishop and Dr. J. Golden and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

.

8 011030 W,0

l

.

.

e

' Commonwealth Edison Company

-2-

SEP 2 6 1980

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

3

A.

B.. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection

Reports No. 50-373/80-38

and No. 50-374/80-24

cc w/ enc 1:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

Construction Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. II. Ilolyoak, Station

Superintendent

Mr. B. B. Stephenson,

Project Manager

Central Files

Reproduction Unit NRC 20b

~

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean llansell, Office of

Assistant Attorney General

!

!

l